Similar Projects
Windows and HVAC Replacement
Renovation
Bidding
$222,869 CJ est. value
N Dartmouth, MA 02747

Window and HVAC Replacement
Renovation
Sub-Bidding
$222,869 CJ est. value
East Freetown, MA 02717

Window and HVAC Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
New Bedford, MA 02740

Designer and Construction Administration Services for Twenty Furnace Replacements
Alteration
Post-Bid
$110,000 est. value
New Bedford, MA

HVAC Maintenance & Repairs
Term Contract
Post-Bid
Hyannis, New Bedford, MA - Middletown, Providence, RI 02908

HVAC Upgrades of Floriculture Building - Filed Sub-Bids Due
Alteration
Results
$150,000 est. value
Dighton, MA 02715

HVAC Upgrades of Floriculture Building - General Bids Due
Alteration
Results
$150,000 est. value
Dighton, MA 02715

Mini-Split Heat/Ac Unit
Alteration
Post-Bid
Dighton, MA 02715

New PFAS Facility, Cate Springs Well - Sub Bid
Alteration
Results
$450,000 est. value
Mansfield, MA

Installation of One Trane 97% VS 2 Speed Multi-Positioned Gas Furnace
Alteration
Post-Bid
Dighton, MA 02715

Toilets, Heat Replacement, Bath Fans and Siding
Alteration
Results
$1,040,000 est. value
New Bedford, MA

Annual HVAC Preventative Maintenance and Repair Services
Term Contract
Post-Bid
$10,000 est. value
North Attleboro, MA

Toilets, Heat Replacement, Bath Fans and Siding
Alteration
Results
$1,040,000 est. value
New Bedford, MA

Weatherization
Term Contract
Post-Bid

Carney and Hayden-McFadden Schools Cooler Replacement - Sub-Bids
Alteration
Results
$280,000 est. value
New Bedford, MA 02740

Last Updated 05/24/2023 02:11 PM
Project Title

Air-Cooled Chiller Replacement - Center for Innovation and Entrepreneurship

Physical Address View project details and contacts
City, State (County) N Dartmouth, MA 02747   (Bristol County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $885,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work under the Contract consists of: 1. All Work either shown on the Drawings or included in the Specifications unless specifically indicated as not to be done. 2. Removal and replacement of the existing roof mounted chiller, AHU-3 and associated exhaust air handling unit ERC-1 heat recovery coil system. The new chiller shall be connected to existing building chilled water piping distribution and automatic temperature control system. The new chiller shall be connected to the existing system and shall be tested, adjusted and balanced prior to being placed in permanent operation. The existing chiller water distribution piping system shall be drained to the point of existing isolation valves in order to perform the work indicated on the contract documents, this shall include cleaning, flushing, filling and chemical treatment associated with the existing and new piping. The new and existing AHU-3 and exhaust air handling unit ERC-1 heat recovery coil piping shall be cleaned and flushed and provide with chemical treatment. The chilled water and heat recovery coil piping shall be filled with 30% by volume propylene glycol solution. Instructions: RFI's should be sent to mboyle@umassp.edu

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents