Similar Projects
Americare Senior Living / Jefferson City
New Construction, Infrastructure
Design
$5,506,601 CJ est. value
Jefferson City, MO 65101

Bridge Rehabilitation
Infrastructure
Bidding
$500,000 CJ est. value
Jefferson City, MO 65101

Bridge Rehabilitation
Infrastructure
Bidding
$500,000 CJ est. value
Jefferson City, MO 65101

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Pavmaster by Gilcrest 414 Tow Type Paver
Infrastructure
Results
MO

2021 Mill And Overlay
Infrastructure
Results
$941,754 est. value
Jefferson City, MO

Health Department Driveway Project
Infrastructure
Construction
$180,637 CJ est. value
Jefferson City, MO 65101

Health Department Driveway Project
Infrastructure
Construction
$180,637 CJ est. value
Jefferson City, MO 65101

Radio Tower Erection Service - PEN Site
Infrastructure, Alteration
Post-Bid
$400,000 est. value
Jefferson City, MO 65109

MODOT Statewide Permanent Roadside Delineation
Infrastructure
Results
Jefferson City, MO 65109

Missouri State Penitentiary Redevelopment - City of Jefferson City
New Construction, Infrastructure, Renovation
Post-Bid
$20,000,000 CJ est. value
Jefferson City, MO 65101

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

Pavement Repairs and Seal Coat Parking Lots
Infrastructure
Post-Bid
$300,000 CJ est. value
Jefferson City, MO 65101

Resurface
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Last Updated 01/20/2023 11:42 AM
Project Title

Route E to Wilcox Road Water Line Upgrade

Physical Address View project details and contacts
City, State (County) Jefferson City, MO 65101   (Cole County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $983,307 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Route E to Wilcox Road Upgrade consists of approximately 6,700 feet of water line installation, most of which is 12-inch water line, and a pressure reducing valve in a precast concrete vault. Work consists of installing the new water line pipe including valves & appurtenances, abandoning some existing water line, & construction of the PRV vault. The project will also contain a roadway crossing bore of State Route E & a creek crossing bore of Perche Creek, both of which will be 12-inch carrier pipe with 20-inch casing.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents