Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Public Works Garage Cold Storage Addition
Addition, Demolition, Infrastructure
Design
$60,000 CJ est. value
Tremont, ME 04653

Design Review - Peekytoe Provisions
New Construction, Infrastructure - 2,500 SF
Design
$650,000 CJ est. value
Bar Harbor, ME 04609

ACAD 312255 Rehabilitate Schoodic Water and Wastewater Systems
Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Winter Harbor, ME 04693

ACAD 151309, Demolish and Construct New Maintenance Facility (GAOA Project)
Demolition, New Construction, Infrastructure - 20,000 SF
Bidding
$10,000,000 CJ est. value
Bar Harbor, ME 04609

Paving Replacement Project at Beech Hill School
Infrastructure
Post-Bid
Otis, ME 04605

Road Paving
Infrastructure
Post-Bid
Swans Island, ME

On Call Milling Machines and Grinders
Results

On Call Maintenance Paving
Results

Retaining Walls Replacement Phase 2
Infrastructure
Bidding
$300,000 CJ est. value
Bucksport, ME 04416

North and South Abutment Reconstruction
Infrastructure
Post-Bid
Northeast Harbor, ME

(LCP) Light Capital Paving
Results
Less than $1,249,000 est. value

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

(LCP) Light Capital Paving
Results
Less than $1,779,000 est. value
Amherst, Clifton, Ellsworth, Gouldsboro, Jonesboro, Mariaville, Milbridge, Otis, Sorrento, Steuben, Sullivan, ME

Rehabilitate Parking Lots, Overlooks and Raods, Acadia National Park (ACAD 318349)
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Bar Harbor, ME 04609

Last Updated 08/10/2022 09:36 AM
Project Title

Main Street Sidewalk, Drainage, Water, and Sewer Improvements

Physical Address View project details and contacts
City, State (County) Southwest Harbor, ME 04679   (Hancock County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $2,959,769 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 10, 2022, bids were canceled. No definite date for the rebid. Bidders must complete a highway, bridge, or project specific pre-qualification through Maine DOT to be awarded the Contract. The lowest responsive bidder must have completed or successfully complete, a Highway Construction prequalification or project specific prequalification to be considered for the award of this contract. Description: Federal Aid Project No. 02220400, WIN 022204.00 Location: In Hancock County, project is located on Main Street (State Route 102), beginning approximately 500 LF South of Wood Street and extending 400 LF North of Apple Lane. Outline of Work: New sidewalk, curbing, landscaping, sewer, water, and storm drain along with surface restoration and other incidental work. The basis of award will be Section 1, Base Bid only. For general information regarding Bidding and Contracting procedures, contact Annaleis Hafford at (207) 223-2232. For project-specific information, email all questions to Project Manager Annaleis Hafford P.E., Olver Associates Inc., at annaleis@olverassociatesinc.com. Questions received after 12:00 noon of the Monday (or, if that Monday is a state holiday, Friday) prior to the bid date will not be answered. Bidders shall not contact any other municipal staff for clarification of Contract provisions; the Municipality will not be responsible for any interpretations so obtained. Each Bid must be made upon blank forms provided by the Municipality and must be accompanied by a bid bond at 5% of the bid amount or an official bank check, cashier's check, certified check, or certificate of deposit. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each for 100 percent of the Contract price, will be required of the successful Bidder. This Contract is subject to all applicable Federal Laws. The Municipality reserves the right to reject any or all bids. DBE participation goal of 1.97% MBE (.8%), WBE (6.9%) To substantially complete the work within 330 calendar days and to complete the work within 360 calendar days ofthe formal Notice to Proceed.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents