Similar Projects
Frank-Bartow Sanitary Sewer Extension Project
Infrastructure
Bidding
Durbin, WV 26264

Wildlife-Reeds Creek Hatchery Septic System Replacement
Infrastructure
Bidding
Franklin, WV

Old Main Sanitary Sewer Upgrades
Post-Bid
Huntington, WV 25755

Sewage Pumping Burnsville Lake
Post-Bid
Burnsville, WV

S--36C24519q0141 | Grease Trap Cleaning | Huntington WV VA
Results
Huntington, WV 25704

East Martin Street Utility Relocation
Results
$542,955 est. value
Martinsburg, WV 25401

Coalwood Sewer Project (Phase 1) Contract 1 - Wastewater Collection System
Post-Bid
Welch, WV

Enterprise Sanitary Sewer Collection System
Results
West Milford, WV 26451

North Bend State Park Sewer Line Replacement
Post-Bid
South Charleston, WV

Contract 2 - Sanitary Sewer Collection System Improvements
Results
Clarksburg, WV

Franklin Elementary Sewer Extension
Renovation, Infrastructure
Post-Bid
Wellsburg, WV 26070

Sewer System Cleaning Equipment
Results
WV

Grease Trap Pumping Service - North Central Regional Jail
Term Contract, Infrastructure
Post-Bid
Greenwood, WV 26415

Phase 3 - Wastewater Collection and Treatment System Improvements
Results
Wheeling, WV 26003

Grease Trap Pumping Service - Central Regional Jail
Term Contract, Infrastructure
Post-Bid
Sutton, WV 26601

Reported 09/15/2021 12:00 AM
Project Title

Sum Utility Improvement

Physical Address View project details and contacts
City, State (County) Summersville, WV 25701   (Nicholas County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Accepting Solicitations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall install new potable waterline valves, flow meters, pressure reducing valves, related appurtenances, and a new water service tap with accessories in the Battle Run Recreation Area at Summersville Lake. The Contractor shall also replace one manhole and install a catch basin and storm sewer culver in Battle Run Campground. The project area is located approximately one mile west of Summersville Dam and 0.3 miles north along Battle Run Road, and is shown on Attachment A, Location and Vicinity Maps. All items shall be installed, tested, and waterlines disinfected for a complete turn-key product. The Recreation Area will be closed to the public during the contract and no provision to maintain existing water or sewer service during construction is required. However, other contractors will be working in the area. All excavation is unclassified; however, based on previous excavations in the area, solid rock is expected in all areas. Note that this contract replaces or installs new valves on existing waterline and sewerline; therefore, work will be accomplished in the existing trenches. However, if any additional excavation is required to facilitate the installation (particularly the new culvert), it will most likely be in solid rock.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents