Similar Projects
Aircraft and Flight Equipment Building, Redstone Arsenal, Alabama
- 60,000 SF
Results
$25,000,000 to $100,000,000 est. value
Redstone Arsenal, AL 35898

Hangar E - Part A
New Construction
Results
Meridianville, AL 35759

Demolition and Replacement of the North Apron Hangars at Foley Municipal Airport
Renovation
Results
$2,644,726 est. value
Foley, AL 36535

T-Hangar Construction Project
New Construction
Post-Bid
Auburn, AL 36830

Shelby County Airport Mass Hangar D
Results
Less than $598,926 est. value
Calera, AL 35040

Improvements to Albertville Regional Airport
New Construction
Post-Bid
Albertville, AL 35950

Allied Support Sun Shelters
New Construction
Results
$500,000 to $1,000,000 est. value
Montgomery, AL

RMACC-Phase II-Hazardous Devices School Fuselage Training Facility
Results
$500,000 to $1,000,000 est. value
Redstone Arsenal, AL

Last Updated 03/04/2022 07:21 AM
Project Title

Hangar Projects at Cullman Regional Airport

Physical Address View project details and contacts
City, State (County) Vinemont, AL 35179   (Cullman County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Hangar Projects at Cullman Regional Airport. Major items of work include: site work, foundation, and construction of three hangars: base bid - first 100' x 100' hangar, alternate #1 - second 100' x 100' hangar, and alternate #2 - 70' x 70' hangar. These projects are "design-build" and includes all required site and building design and engineering; foundation, structure, utilities, fire protection; doors, windows, restrooms, finishes; HVAC, lighting, electrical, plumbing, and other associated items to create a fully capable facility.

Details

,, 14,900 SF - 2 Aircraft Hangar, 10,000 SF New Construction, 1 Aircraft Hangar, 4,900 SF New Construction.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents