Similar Projects
HVAC Maintenance, Repairs, Replacements at Sunken Gardens
Alteration
Bidding
Saint Petersburg, FL 33704

HVAC Unit at Fred Howard Park
Alteration
Bidding
Tarpon Springs, FL 34689

Chillers, Direct Purchase
Term Contract
Post-Bid
FL

HVAC and Mechanical Products
Term Contract
Post-Bid

Air Compressor - Exhaust System Ducting Project
Results
Clearwater, FL 33762

Rooftop Unit (RTU) Replacement
Results

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Chillers and Cooling Tower Replacement
Term Contract
Results
$633,934 est. value
Saint Petersburg, FL 33703

Woodlawn Elementary - Kitchen HVAC Renovations
Post-Bid
Saint Petersburg, FL 33704

HVAC Replacement Largo Police Department
Results
Largo, FL 33771

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Chillers And Cooling Tower Replacement
Results
Saint Petersburg, FL

Parc Inc Roof Top Air Conditioning Units
Term Contract
Post-Bid
Saint Petersburg, FL 33710

Retrofit Existing Fire Stations External Source Capture Exhaust System
Results
Clearwater, Kenneth City, Pinellas Park, FL 33762

Heating and Air Conditioning Preventative Maintenance and Repair
Alteration
Post-Bid
Seminole, FL

Last Updated 04/20/2022 12:53 PM
Project Title

HVAC Replacement

Physical Address View project details and contacts
City, State (County) Palm Harbor, FL 34683   (Pinellas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $220,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of furnishing of all labor/materials and performing all work necessary to the complete of the following 1) Building 1, 2, 5, & 6: Remove electric heat strip from existing roof top unit(s) (RTU) serving classrooms. Provide a variable air volume (VAV) box with electric in each classroom and tie into existing ductwork system. Modify controls for system to function as a static pressure driven variable air volume system with electric reheat. 2) Building 8: Classrooms 08-002 and 08-003 shall follow the scope described above. Classrooms 08-003 and 08-004 are each served by their own unit; no VAV boxes are required. Remove electric strip heat from existing RTU(s) and provide duct mounted electric strip heat in the supply ductwork and modify controls to allow for dehumidification. 3) Building 4: Replace existing air handling unit (AHU) with a single zone variable volume system. Replace existing chilled water pipe from existing AHU up to and including shutoff valves. Replace existing duct mounted electric strip heater. Modify controls to accommodate the new unit’s sequence of operations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents