Similar Projects
A2 North Maple
New Construction - 1,800 SF
Conception
Ann Arbor, MI 48103

Sakura Asian Village
New Construction - 47,477 SF
Design
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

Brightdawn Village Condominiums
New Construction - 956,000 SF
Design
$32,000,000 est. value
Ann Arbor, MI 48104

Filmore Place - Phase I and Phase II
New Construction - 154,000 SF
Post-Bid
Canton, MI 48187

Design Build Services for Rochester Community House
Renovation, Addition
Post-Bid
Rochester, MI 48307

West Currie Clubhouse Crawl Space
Results
Midland, MI

Berwyn Senior Center Improvements
Renovation
Results
Less than $45,843 est. value
Dearborn Heights, MI 48127

Advia Credit Union Administration Building
New Construction - 150,000 SF
Construction
$26,000,000 est. value
Oshtemo, MI 49009

Residences at River Trail
New Construction - 696,000 SF
Construction
$18,000,000 to $20,000,000 est. value
Auburn Hills, MI 48321

The Reserve at Crystal Lake - Single Family Homes
New Construction
Pending Verification
Commerce Township, MI 48382

820 Sixteen
New Construction - 3,500 SF
Pending Verification
Holland, MI 49423

West Village of Brighton Townhomes
New Construction
Design
Brighton, MI 48116

Portage Community Senior Center
New Construction - 36,000 SF
Post-Bid
Portage, MI

Restoration Currie East Clubhouse
Renovation
Results
Less than $64,037 est. value
Midland, MI 48640

Bayview Yacht Club Renovations
Renovation - 12,688 SF
Construction
$3,700,000 to $4,300,000 est. value
Detroit, MI 48215

Reported 01/29/2022 12:00 AM
Project Title

Lost Lake Woods Club New Freight Elevator

Physical Address View project details and contacts
City, State (County) Lincoln, MI 48742   (Alcona County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

New Freight Elevator – Remove existing dock and create a new elevator shaft for two floors with exterior enclosure. The creation of a new corridor through the mechanical space will be required. And a new dock will be created just outside of the new enclosed elevator shaft.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 05 - Metals.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers, Sheet Metal Flashing and Trim.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Common Work Results for Fire Suppression, Hangers and Supports for Fire-Suppression Piping and Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 33 - Utilities, Water Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents