Similar Projects
JPMC Carpet Broadloom and Tiles
Term Contract
Bidding
Springfield, IL 62702

Theatre Concrete Polishing and Terrazzo Installation
Post-Bid
Des Plaines, IL 60016

Highland Flooring Replacement
Post-Bid
Downers Grove, IL 60515

Amp 2 Kitchen, Bathroom, And Flooring Upgrades
Renovation
Results
Springfield, IL 62702

DNR Des Plaines State Fish and Wildlife Area Concrete Floor Slab
Results
Wilmington, IL 60481

Classroom Flooring at McCracken MS & Middleton ES
Post-Bid
Skokie, IL 60076

Basement Seepage Remediation
Results
Less than $600,000 est. value
Saint Charles, IL 60175

Village Hall Carpeting Installation
Post-Bid
Volo, IL 60073

Carpeting and Painting
Results
Peoria, IL 61602

Restroom Resinous Flooring Replacement
Post-Bid
Romeoville, IL 60446

B Building Finish Replacements
Renovation
Results
Less than $102,750 est. value
Carterville, IL 62918

McHenry County Jail Shower Epoxy Finish Replacement Services
Post-Bid
Woodstock, IL 60098

Centennial East Scene Shop Flooring
Renovation
Results
Normal, IL 61790

Don Preston Gym Replacement Floor
Post-Bid
$200,000 est. value
Midlothian, IL 60445

Kitchen Floor Tile Replacement at Ogden Elementary School
Results
Chicago, IL 60610

Reported 10/03/2020 12:00 AM
Project Title

Adlai E Stevenson High School – Carpet & Tile

Physical Address View project details and contacts
City, State (County) Lincolnshire, IL 60069   (Lake County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes replacement of existing carpet and carpet tiles in various areas of the building, with completion scheduled by January 4, 2021. BID RELEASE 1 - BID PACKAGE BP# Description 09A Carpeting Installation Work

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents