Similar Projects
Fairview Road - Los Viboras Road to Aquistapace Road - San Benito County
Alteration
Conception
$363,950 est. value
Hollister, CA 95023

Wright Road - Buena Vista Road To 1 Mile East - Pwb2102 - San Benito County
Alteration
Conception
$2,650,000 est. value
Hollister, CA 95023

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Construct a New Interchange at Castroville Boulevard and Highway 156
Alteration
Design
$25,000,000 est. value
San Juan Bautista, CA 95045

Street Repairs at Various Locations
Infrastructure
Bidding
$500,000 to $600,000 est. value
Hollister, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

SB1 Road Maintenance Projects at Various Locations, FY 2020-2021
Infrastructure
Results
Hollister, CA

Construct roundabout
Infrastructure
Results
$9,000,000 est. value
CA

New Idria Road Crossing - San Benito County
Infrastructure
Conception
$470,000 est. value
Idria, CA

Rocks Road Bridge Replacement Over Tres Pinos Creek - RF 33-705 - San Benito County
New Construction, Demolition, Infrastructure
Design
$3,104,000 est. value
San Juan Bautista, CA 95045

Hollister Air Attack Base - Temporary Barracks Utility Installation
Alteration
Post-Bid
$2,000,000 est. value
Hollister, CA 95023

Widening Highway From 2-Lane to 4-Lane Controlled Access Highway
Infrastructure
Results
$55,000,000 est. value
CA

Cienega Road - Mudstone Ranch to Bird Creek - San Benito County
Alteration
Conception
$879,500 est. value
Hollister, CA 95023

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Last Updated 07/12/2022 11:55 AM
Project Title

Cole Road to South Ricardo to North Ricardo to Anzar Road - PWB-2105 - San Benito County

Physical Address View project details and contacts
City, State (County) Aromas, CA   (San Benito County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $674,844
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Cole Road to South Ricardo to North Ricardo to Anzar Road Project is included in the San Benito County's FY 2021-2025 CIP. As of July 11, 2022, information regarding a design team or a general contractor is not available. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents