Similar Projects
PBSO, District 6 - Chiller Replacement
Bidding
Lake Worth, FL 33467

WUD, WTP 3 - Exhaust Fans Replacement
Term Contract
Bidding
Delray Beach, FL 33446

Cooling Tower Replacement
Post-Bid
Less than $2,700,000 est. value
Boca Raton, FL 33431

PBSO Real Time Crime Lab - HVAC Upgrades
Term Contract
Post-Bid
West Palm Beach, FL 33406

PBSO District 3 - HVAC Replacement
Term Contract
Results
West Palm Beach, FL

2019 Commercial Pool Cooler
Results
North Palm Beach, FL 33408

Library Gruber Sandbox Building LY - 3
Post-Bid
Boca Raton, FL 33431

Hagen Ranch Road Library - Chiller Replacement
Results
Delray Beach, FL 33446

Building 12 Animal Lab Renovation
Post-Bid
Boca Raton, FL 33431

GCC - Air Handler Unit #11 Replacement
Term Contract
Results
West Palm Beach, FL 33401

Commercial Pool Cooler System
Post-Bid
North Palm Beach, FL 33408

MCCH - HVAC Replacement AHU #27
Term Contract
Results
West Palm Beach, FL 33401

HVAC and Air Duct Replacement and Installation
Term Contract
Post-Bid
West Palm Beach, FL 33415

MCCH - HVAC Replacement AHU #28
Term Contract
Results
West Palm Beach, FL 33401

Fleet - Exhaust Fan Replacement
Term Contract
Post-Bid
Less than $125,000 est. value
West Palm Beach, FL 33411

Reported 03/18/2020 12:00 AM
Project Title

Pahokee Housing Authority Padgett Island / Fremd Village HVAC Project

Physical Address View project details and contacts
City, State (County) Pahokee, FL 33476   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

A. Project scope of work consists of: All labor and material for the work. Work consists of the supply and install of new HVAC systems in existing, Non-HVAC units. Padgett Island consists of 18 separate buildings 56 individual apt units, and Fremd Village consists of 26 buildings 58 individual apt units. New attic 1 hr walls where necessary, new bathroom exhaust fans with roofing patch, new electrical work for the new systems install, new ceiling fan / lights, new compressor pads with associated structural piles, and all accessory components and details that complete the project. Work consists of some asbestos abatement in the Padgett Island Buildings.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents