Similar Projects
Roof Replacment and Repair Services
Bidding
Charlotte, NC

Providence High School Phase II Roof Replacement
Bidding
Charlotte, NC 28270

Blumenthal Performing Arts Center (PAC) Roof Replacement - Lower Level
Post-Bid
Less than $469,000 est. value
Charlotte, NC 28202

MRF Roof Repair
Post-Bid
Charlotte, NC 28215

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Butler High School Phase II Roof Replacement
Bidding
Matthews, NC 28105

Snoopy Hangar Roof Replacement and Repairs
Post-Bid
Charlotte, NC 28208

South Charlotte Middle School Roof Replacement
Results
$601,400 est. value
Charlotte, NC 28277

Windsor Park Elementary School Roof Replacement
Bidding
Charlotte, NC 28205

Roofing MACC
Post-Bid

Butler High School Phase I Roof Replacement
Results
$837,450 est. value
Matthews, NC 28105

Spaugh Middle School Areas A1-A4 Roof Replacement
Bidding
Charlotte, NC 28208

Roofing Repair and Maintenance
Post-Bid

Charlotte-Mecklenburg Government Center (CMGC) Upper Roof Recover
Results
Less than $484,000 est. value
Charlotte, NC 28202

Last Updated 10/26/2020 04:14 PM
Project Title

145th CE Repair Roofing Project for Building 51 & 5

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28208   (Mecklenburg County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CLIN #1 REPAIR ROOF - BLDG. 51: The Contractor shall include the work herein but not limited to the removal the existing roof membrane and insulation down to the existing metal decking. Inspection of the roof decking material shall be accomplished to determine if any metal decking is damaged and if so, how much. Include in proposal labor cost for 5000 sq. ft. of deck replacement with the GFE (see below) provided material. If decking is replaced, ensure devices (smoke detectors, etc.) that may be mounted to the bottom side of the decking are removed and replaced on new decking. Mechanically fasten 2 layers of 2.2" insulation (r-24) over the existing metal deck. Install a 60 mil Rhino-bond PVC membrane roof system over the newly installed insulation. Flash all wall, curbs, stacks, pitch pockets, drain, and exhausts fans. Install new ES-1 coping metal on all walls. Haul away all roof debris, see below regarding waste reporting. Provide owner with a 20 year manufacture warranty and a lightning protection ground resistance test verifying that the lightning protection which was removed during the roof removal was properly reconnected. See Attachment A for building 51 drawings and info. CLIN #2 REPAIR ROOF - BLDG. 5: The Contractor shall include the work herein but not limited to the removal the existing roof membrane and insulation down to the existing metal decking. Inspection of the roof decking material shall be accomplished to determine if any metal decking is damaged and if so, how much. Include in proposal labor cost for 600 sq. ft. of deck replacement with the GFE (see below) provided material. If decking is replaced, ensure devices (smoke detectors, etc.) that may be mounted to the bottom side of the decking are removed and replaced on new decking. Mechanically fasten 2 layers of 2.2" insulation (r-24) over the existing metal deck. Install a 60 mil Rhino-bond PVC membrane roof system over the newly installed insulation. Flash all wall, curbs, stacks, pitch pockets, drain, and exhausts fans. Install new ES-1 coping metal on all walls. Haul away all roof debris, see below regarding waste reporting. Provide owner with a 20 year manufacture warranty, note that bldg. 5 has no lightning protection system.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents