Similar Projects
East Main Street Sidewalk Project
Infrastructure
Bidding
$180,000 CJ est. value
Jerome, ID 83338

East Main Street Sidewalk Project
Infrastructure
Bidding
$180,000 CJ est. value
Jerome, ID 83338

Readiness Center (Re-Bid)
LEED Certification, New Construction, Infrastructure - 48,500 SF
Post-Bid
$18,400,000 CJ est. value
Jerome, ID 83338

Readiness Center (Re-Bid)
LEED Certification, New Construction, Infrastructure - 48,500 SF
Post-Bid
$18,400,000 CJ est. value
Jerome, ID 83338

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Seal Coat
Infrastructure
Results
$2,500,000 to $5,000,000 est. value

Jerome County Readiness Center - Re-Bid
LEED Certification, New Construction, Infrastructure - 48,500 SF
Post-Bid
$18,400,000 CJ est. value
Jerome, ID 83338

Idaho Federal Aid Project - Lincoln, Gooding Jerome County
Alteration
Results
Jerome, ID 83338

I-84, Jerome IC to Twin Falls IC 19338 - South Jerome IC 23202 - US-93, Interchange 173 Ramps
Infrastructure
Post-Bid
$800,000 CJ est. value
Jerome, ID 83338

Moscow North and Moscow Alt Route
Infrastructure
Results

Adding Two through Lanes On Us-93, Mp 57.23 To 59.49; 100 South Rd.
Infrastructure
Results
ID

FY23, SH-34 D5 Guardrail Replacement
Infrastructure
Results
$1,100,000 CJ est. value
Preston, ID 83263

Last Updated 01/27/2023 02:17 PM
Project Title

300 West, 100 North to 200 North Cement Recycled Asphalt Base Stablization (CRABS)

Physical Address View project details and contacts
City, State (County) Jerome, ID 83338   (Jerome County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Pulverization of existing AC surface, addition of 3/4 " base aggregate, road widening, and Cement Recycled Asphalt Base Stabilization (CRABS) on 300 W between 100 N and 200 N in Jerome, Idaho. Bids are requested for the following Contract: 300 W; 100 N to 200 N CEMENT RECYCLED ASPHALT BASE STABLIZATION (CRABS) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents