Similar Projects
Last Updated | 03/31/2021 11:03 AM |
Project Title | Tin Town Streets and Drainage Project |
Physical Address | View project details and contacts |
City, State (County) | Bisbee, AZ 85603 (Cochise County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Tintown Phase 3 streets and drainage project includes reconstruction of roads with an inverted crown to improve drainage, erosion control, and manhole adjustments. The streets portion will include removal of existing chip seal roads where applicable, subgrade preparation and approximately 8,025 square feet of new road surfacing with curb and valley gutters. There will also be an installation of a drainage channel at the southern drainage outlet with channel excavation, 60 cubic yards of gabion and 70 cubic yards of riprap. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |