Similar Projects
Reported | 05/30/2020 12:00 AM |
Project Title | CBP - Brickell - Paint and Install Cabinets in Room 909 |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL 33131 (Miami-Dade County) |
Category(s) | Single Trades |
Sub-Category(s) | Furnishings |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | $25,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The General Services Administration (GSA) Southeast Sunbelt Region 4 announces the opportunity for a Request for Proposal to provide construction services for Customs and Border Protection. Work shall include but is not limited to: DEMOLITION: Remove and Dispose Remove existing furniture and protect as necessary. Remove existing vinyl base from Training Room and Kitchen as per attached drawing. Disconnect existing plumbing from existing cabinet in adjacent kitchen. Remove existing countertop, upper and lower cabinets and dispose of properly. REMODEL: Contractor shall protect existing VCT and carpet tiles to prevent possible damage caused by painting. Contractor to patch existing walls as needed and sand if required. Contractor to apply two (2) coats of Low/No VOC paint to the walls in the Training Room, Kitchen and hall leading into Training Room on the 7th Floor. Color to match existing color in main CBP office and approved by the CBP Representative. Contractor to install new cabinetry in Kitchen area with Solid Surface counter top. Cabinets will match existing cabinet layout. Cabinets to match existing cabinets in main CBP office and approved by the CBP Representative. Contractor to install new Solid Surface countertop, sink and faucet. Color of Solid Surface shall be approved by the CBP Representative. Contractor to paint existing door frames (approximately 7 ea). Color of frames to match existing color in main CBP office and approved by the CBP Representative. Contractor to install approximately 250 LF of new vinyl base in areas where it was removed. Color to match existing vinyl base in main CBP office and approved by the CBP Representative. Contractor to replace all furniture removed prior to start of project. Contractor to wipe down all areas to ensure no construction dust remains. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |