Similar Projects
Existing Pre-K, Elementary, Middle and High Schools Renovations & Additions
Renovation, Addition
Conception
Cadet, MO 63630

Existing Pre-K, Elementary, Middle and High Schools Renovations & Additions
Renovation, Addition
Conception
Cadet, MO 63630

Multiple Construction Projects
Renovation
Design
$300,000 est. value
Oak Hill, MO

Engineering Works
Renovation
Design
Clarkton, MO

CPS Nature School
New Construction - 8,500 SF
Bidding
$3,000,000 est. value
Columbia, MO 65201

Wheaton Cafeteria Tornado Shelter Package A ( Precast and TPO)
New Construction
Bidding
$4,000,000 est. value
Fairview, MO 64842

Ladue Middle School
Renovation
Post-Bid
Saint Louis, MO 63124

York Elementary School
New Construction
Post-Bid
Springfield, MO 65802

Mark Twain Elementary Gym-Music safe Room and Eugene Elementary Gym-Music safe Room
Addition
Results
Springfield, MO 65807

North Glendale Elementary, Secured Vestibule Renovation Project 2021
Renovation
Results
Kirkwood, Saint Louis, MO 63122

Ladue Old Bonhomme Elementary
Renovation
Construction
Saint Louis, MO 63132

Briarcliff Elementary
Renovation, Addition - 10,300 SF
Construction
Kansas City, MO 64116

New Elementary School
New Construction
Conception
Columbia, MO

Bernard Campbell School
Renovation, Addition
Post-Bid
Pleasant Hill, MO

Jefferson Middle School
Renovation, Addition
Results
Columbia, MO 65201

Reported 06/24/2022 12:00 AM
Project Title

2022 Facility Improvements

Physical Address View project details and contacts
City, State (County) Russellville, MO   (Cole County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $335,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

High School: Removal of existing connector building between the main high school facility and the vocational facility. Construction of a new connector building at the same location where the existing connector building was removed, and related work for same. Partial exterior masonry restoration of the main high school facility's gymnasium. Elementary & Middle School: Removal and replacement of existing exterior steps near the southwest area of the building. See drawings for location.

Details

Middle/Senior High School, Renovation, Elementary School, Renovation, 126,290 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents