Similar Projects
900 East Well Re-Equipping Project
Infrastructure
Bidding
Murray, UT 84107

Purchase and Deliver Well Surface and Intermediate Casing Forge
Term Contract
Post-Bid
Salt Lake City, UT 84112

Water Treatment- Green Well
Post-Bid
Riverton, UT

Well No. 8 Chlorinator Replacement
Results
Salt Lake City, UT 84119

Murray Park Well
Results
Less than $1,257,651 est. value
Murray, UT 84107

Drilling Rig and Services for Paradox Basin
Post-Bid
Salt Lake City, UT

Flat Iron Mesa Well House Construction Project
Results
Sandy, UT 84070

Walker Lane Well Rehabilitation
Post-Bid
Less than $2,000,000 est. value
Holladay, UT 84117

Well in Paradox Basin
Term Contract
Results
Salt Lake City, UT 84112

Chlorination Updates - Hancock Well and Oak Street Well Projects
Post-Bid
Midvale, Sandy, UT 84094

Pump-House Parts and Repairs
Term Contract
Results
Salt Lake City, UT 84190

Well Cementing Services for Forge Well 78B-32
Infrastructure
Post-Bid
Salt Lake City, UT 84112

Decker Main WWPS Pump Replacement - Phase 2
Results
Less than $450,000 est. value
West Valley City, UT 84119

7 Inch Master Valve Well 78B-32 Forge
Infrastructure
Post-Bid
Salt Lake City, UT 84112

Well Site Housing Units
Results
Salt Lake City, UT 84112

Last Updated 06/10/2021 09:29 AM
Project Title

Construction Services - Riverfront Park Test Well

Physical Address View project details and contacts
City, State (County) South Jordan, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results, No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The base bid will consist of the construction of one 6-inch test well drilled to approximately 80 feet deep. The test well consists of a 6-inch diameter Schedule 80 PVC well casing to 40 feet below ground surface and a 6-inch diameter Schedule 80 PVC well screen with 0.032 slot size (mill cut) from approximately 40 feet to 75 feet below ground surface.

Details

Division 00 - Procurement and Contracting Requirements, Available Project Information, Geotechnical Data, Subsurface Drilling and Sampling Information.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents