Similar Projects
Pavement Preservation North Dakota
Term Contract
Design
$5,000,000 to $7,000,000 est. value
Buford, Dickinson, ND

Pavement Preservation North Dakota
Term Contract
Design
$5,000,000 to $7,000,000 est. value
Buford, Dickinson, ND

Grading and Aggregate Surfacing
Infrastructure
Bidding
$625,000 est. value
Manning, ND

Bolley Drive Reconstruction
Post-Bid
$342,260 to $344,066 est. value
Fargo, ND 58102

Paving, Sanitary Sewer, Storm Sewer, Water Main Improvements
Post-Bid
$3,000,000 to $3,500,000 est. value
Valley City, ND

Urban Limit of Grafton to North Junction ND 66 at St Thomas
Results
Grafton, ND

Urban Limit of Grafton to North Junction ND 66 at St Thomas
Results
Grafton, ND

Rural Residential Development and Stables/Riding Arena
New Construction, Infrastructure - 33,600 SF
Construction
$3,500,000 est. value
Dickinson, ND

2021 City Wide Seal Coat and HMA Overlay
Post-Bid
Gladstone, ND

32nd Street Southwest Road Reconstruction
Results
$275,000 est. value
Dickinson, ND

Four FEMA Sites - Performing Grade Raises, Embankment Stabilization, Riprap and Surface Graveling of Township Roadway
Infrastructure
Post-Bid
Medina, ND

Water Main Replacement, Street Reconstruction and Incidentals
Results
Less than $3,523,290 est. value
Fargo, ND 58102

Track 6 and 7 Improvements
Infrastructure
Post-Bid
Grand Forks, ND

P.C. Concrete Alley Paving, Water Main and Incidentals
Results
Less than $163,673 est. value
Fargo, ND 58102

Subgrade Repairs
Term Contract
Post-Bid
ND

Last Updated 06/22/2022 05:46 AM
Project Title

114th Avenue South West

Physical Address View project details and contacts
City, State (County) Killdeer, ND   (Dunn County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work Consist of Contract bond-1 LS; Common Excavation - Type A - 95,000 CY; Topsoil - 30,000 CY; Cement Stabilized Subgrade - 35,000 SY; Portland Cement - 900 Tons; Pipe Conc Reinf - Various Sizes (48" Max); CSP Pipe Conduit- Various Sizes (18" Max); Mobilization - 1 LS; Traffic Control - 1300 UNITS; Flagging - 1350 MHR; Pilot Car - 450 HR; Fiber Rolls 12IN - 4,000 LF; Seeding - 40 ACRES; Straw Mulch - 40 ACRES.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents