Similar Projects
Duplaga Professional Center
New Construction - 12,000 SF
Conception
Wheeling, WV

Park Place Commercial Center - Storage Facility
New Construction - 104,580 SF
Conception
$10,000,000 CJ est. value
South Charleston, WV

Mini Storage
New Construction
Design
Martinsburg, WV 25404

Water Treatment Plants and Storage Facilities
New Construction
Design
Athens, WV

Ritchie County Recycling Center
New Construction - 7,800 SF
Bidding
Ellenboro, WV 26346

48'x48'x18' Maintenance Building, Electrical, Boiler Work, Plumbing
Alteration - 2,304 SF
Post-Bid
Wiley Ford, WV 26767

Triamigas Self Storage
New Construction - 98,000 SF
Post-Bid
Martinsburg, WV 25404

White Horse Pre-Engineered Metal Storage Building
New Construction - 2,376 SF
Results
$698,500 est. value
Springfield, WV

Ridgeview Elementary School Kitchen Addition, Canopies and Storage Buildings
Addition - 1,225 SF
Results
Less than $1,150,000 est. value
Crab Orchard, WV 25827

Panhandle Cleaning and Restoration
New Construction - 12,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Wheeling, WV 26003

Boyd Cat Dyno Renovations
Renovation
Construction
Belle, WV 25015

Sheetz Transfer Station
New Construction - 1,900 SF
Pending Verification
$2,000,000 est. value
Kearneysville, WV

EM E-911 Storage Facility
New Construction - 6,100 SF
Post-Bid
New Martinsville, WV 26155

ABCA Warehouse Fire Prevention Renovations
Renovation - 152,720 SF
Results
$858,482 est. value
Nitro, WV 25143

Rhino Self Storage
New Construction - 59,500 SF
Construction
$4,700,000 est. value
Charleston, WV 25314

Last Updated 10/06/2021 09:15 AM
Project Title

Harvest Care Medical at Harrison Regional Industrial Park

Physical Address View project details and contacts
City, State (County) Clarksburg, WV 26301   (Harrison County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Design-Build Firm to Subcontract.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $3,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Warehouse/Storage, 50,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents