Similar Projects
Door and Window Replacement at Arthur Clark Apartments (Ma 13-7) - General Bids
Bidding
Less than $295,000 est. value
Waltham, MA

Replacement of Pinecrest Doors and Cupula Repair
Bidding
$25,000 est. value
Holliston, MA

Door and Window Replacement, Arthur Clark Apartments MA 13-7 - Filed Sub-Bids
Sub-Bidding
Less than $295,000 est. value
Waltham, MA

Construction of New 140,000 SF Elementary School Building - Filed Sub-Bid
New Construction - 140,000 SF
Sub-Bidding
Less than $77,500,000 est. value
Tewksbury, MA

Holliston Senior Center Window and Door Replacements
Post-Bid
Holliston, MA

Watertown Free Public Library Entrances-Limited Renovation
Post-Bid
$215,000 est. value
Watertown, MA

Replace Double Doors B1305
Results
Bedford, MA 01832

Replace Doors at Bldg 1991
Results
$25,000 to $100,000 est. value
Bedford, MA 01731

Purchase and Delivery of Vinyl Replacement Windows
Post-Bid
Framingham, MA 01702

Window Replacement, Harts Hill 667-1
Results
$240,000 est. value
Wakefield, MA

Replacement Siding and Entry Door
Post-Bid
Framingham, MA 01702

Window Restoration at Wayland Public Library
Results
Less than $25,000 est. value
Wayland, MA

Plexiglass Installation
Post-Bid
Bedford, MA 01731

Replacement of the Overhead Doors - Natick Public Works
Results
Natick, MA 01760

Exterior Door Replacements - Heath Brook School
Post-Bid
Less than $150,000 est. value
Tewksbury, MA

Last Updated 01/16/2019 08:48 AM
Project Title

On-Call Glass Repairs

Physical Address View project details and contacts
City, State (County) Somerville, MA   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description DCAMM Certification Required. Furnish Labor, Equipment and Materials required to provide Glass Repairs and Installation, necessary to complete specified work in a competent workmanlike manner. Contractor is to remove all surplus material in accordance with specifications prepared by the City of Somerville for a period of One year, with two (2), one-year options to renew. Estimated Construction Cost $150,000.00 Annually and $450,000.00 for 3 years.
Details
Division 08 - Openings, Doors and Frames, Windows.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents