Similar Projects
Green Leaf Community at Childress
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Atlanta, GA 30311

Project Silver
New Construction, Infrastructure
Conception
Douglasville, GA

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Surf Avenue Multi-Residential
New Construction, Infrastructure
Design
$17,000,000 CJ est. value
Stratford, CT 06615

The Proctor
New Construction, Infrastructure - 142,000 SF
Bidding
$55,000,000 CJ est. value
Atlanta, GA 30318

MJ Taylor Road Rehabilitation/Resurfacing
Infrastructure
Bidding
$260,000 CJ est. value
Adel, GA 31620

Physical Activity Center Expansion
Addition, Demolition, Renovation, Infrastructure - 4,987 SF
Post-Bid
$5,000,000 CJ est. value
Roswell, GA 30075

RFQ Design - Construct Community Living Center Right-Size
New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Dublin, GA 31021

New Driver Services Center - DALTON
New Construction, Infrastructure - 8,010 SF
Results
$2,360,000 CJ est. value
Dalton, GA 30721

Blakely Gateway
Infrastructure
Results
$1,718,394 CJ est. value
Blakely, GA 39823

Center for Advanced Surgical Services (CASS)
New Construction, Infrastructure - 556,000 SF
Construction
$180,600,000 CJ est. value
Atlanta, GA 30303

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Zaxby's / Athens
New Construction, Infrastructure - 3,847 SF
Pending Verification
$800,000 CJ est. value
Athens, GA 30605

SeaPoint Industrial Terminal Complex
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Savannah, GA 31404

Hotel Anne
New Construction, Infrastructure - 41,000 SF
Design
$10,000,000 CJ est. value
Savannah, GA 31401

Last Updated 04/21/2023 02:17 PM
Project Title

ARPA 2022-2023 Water Main Replacements

Physical Address View project details and contacts
City, State (County) Vidalia, GA 30474   (Toombs County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall generally consist of furnishing all products and performing all labor necessary to install the following (see Plans and Specifications for complete details and description): Installation of approximately 3,100 LF 6" water main and 7,700 LF 12" water mains along city streets in Vidalia, Georgia. The waterline replacement work is being performed to upsize and/or replace leaking, aging cast iron pipe segments. Roadway milling and paving will also be performed on select streets. Other work involved will include water service transfers, fire hydrant relocations/replacements, replacement of roadway pavement, driveways, curb & gutter, etc.; traffic control, erosion control, and other miscellaneous work. Contractor License: Any Contractor submitting a bid must be licensed by the State of Georgia. See Instructions to Bidders for additional bidding requirements. Bonds: Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 5% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. Funding: This project will be funded through a combination of ARPA State Fiscal Recovery Funds and local funds. All permits required for the construction of this project are expected to be obtained before the bid date. Acquisition of property for easements, right of way, etc. are expected to be obtained before the bid date. Reservation of Rights: Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents