Similar Projects
Apex Community Downtown Streetscape and Parking
Design
Apex, NC 27502

C-5604Aa Kelly And Apex Barbecue Pedestrian Improvements
Bidding
Apex, NC

Stormwater Drainage Assistance Program – 904 Wakestone Court
Bidding
Raleigh, NC

Parking Lot Asphalt Replacement
Post-Bid
Raleigh, NC 27607

Action Park Retaining Wall
Post-Bid
Fuquay-Varina, NC 27526

Dorothea Drive Drainage Improvements (Formal)
Results
Raleigh, NC

Bass Lake Stream Channel Improvements
Results
Less than $836,800 est. value
Holly Springs, NC

Chick-Fil-A Sitework
Addition
Construction
Raleigh, NC 27607

Glen Eden Tennis Access Sidewalk
Post-Bid
Raleigh, NC

Foundation Repairs for the Archives and History Building
Results
Raleigh, NC 27601

Procter Farm Preserve
Post-Bid
Wendell, NC 27591

Bayoak Drive at Joel Court Storm Drainage Improvement Project
Results
Less than $374,677 est. value
Cary, NC

GoCary Amenity Improvements
Post-Bid
Cary, NC

James Street to Downtown Pedestrian Improvements
Results
Less than $654,799 est. value
Apex, NC

Gocary Bus Amenity Improvements
Post-Bid
Cary, NC

Last Updated 02/28/2020 04:18 PM
Project Title

New Hope Church Road Improvements and Green Road Sidewalk

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Roadway widening on New Hope Church Road, intersection improvements at the intersection of Deana Lane and New Hope Church Road and replacing the existing CMP culverts with a 14'x6' reinforced concrete box culvert. The project also includes curb and gutter, storm drainage and erosion control measures, paving, sidewalk, water and sewer main installations, pavement markings, traffic control and other miscellaneous items from Green Road to Deana Lane. Green Road Sidewalk extends from New Hope Church Road to Spring Forest Road and includes sidewalk, curb and gutter, ramps, pavement removal and replacement, storm drainage, transit stops, erosion control measures, tree removals, traffic control and other miscellaneous items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents