Similar Projects
Ward Boulevard Retail Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Wilson, NC 27893

Ward Boulevard Retail Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Wilson, NC 27893

Milling and Resurfacing
Infrastructure
Bidding
$5,000,000 CJ est. value
Wilson, NC 27893

Milling and Resurfacing
Infrastructure
Bidding
$5,000,000 CJ est. value
Wilson, NC 27893

Natural Gas System Improvements
Infrastructure
Post-Bid
$315,000 CJ est. value
Wilson, NC 27893

Underground Primary Replacement
Infrastructure, Alteration
Post-Bid
$700,000 est. value
Wilson, NC

Grading, Drainage, and Paving
Infrastructure
Results
NC

Grading, Drainage, Paving, and Structure
Infrastructure
Results
NC

Fedex Distribution Facility
New Construction - 259,000 SF
Pending Verification
$10,000,000 CJ est. value
Wilson, NC

ABEC Manufacturing Facility
New Construction, Infrastructure - 50,000 SF
Pending Verification
$11,000,000 CJ est. value
Wilson, NC 27893

Fike High School Tennis Court Reconstruction
Infrastructure
Bidding
$240,000 CJ est. value
Wilson, NC 27893

Circle K #2720939 / Wilson
New Construction, Infrastructure - 5,200 SF
Post-Bid
$2,000,000 CJ est. value
Wilson, NC 27893

Pavement Rehabilitation
Infrastructure
Results

Heatherton Grove
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Wilson, NC 27896

Pavement Rehabilitation, ITS, and Structure Preservation
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Wilson, NC 27893

Last Updated 12/09/2022 01:03 PM
Project Title

Believer Meat Manufacturing Facility

Physical Address View project details and contacts
City, State (County) Wilson, NC 27893   (Wilson County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $123,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 9, 2022 the project is in planning stage. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but may begin in the first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 200,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents