Similar Projects
New Performing Arts Center
New Construction - 89,000 SF
Conception
$75,000,000 to $80,000,000 est. value
Fayetteville, NC

Taylor Theatre Infrastructure Renovation
Renovation
Conception
Greensboro, NC

Sportsmanship Crossing Development / Holly Springs
New Construction, Infrastructure - 100,000 SF
Design
$50,000,000 CJ est. value
Holly Springs, NC 27540

Tate + Gate Cultural Arts Center
New Construction - 20,000 SF
Design
Greensboro, NC 27403

Clayton High School, New Auditorium
Addition, Demolition, Infrastructure - 17,800 SF
Bidding
$6,000,000 CJ est. value
Clayton, NC 27520

Thomas Wolfe Auditorium Renovations and Improvements at the U.S. Cellular Center
Renovation
Post-Bid
$100,000,000 CJ est. value
Asheville, NC 28801

Barnes Auditorium Alterations
Renovation
Post-Bid
Tarboro, NC 27886

Phase II Renovations for the Paramount Theater and Art Gallery
Renovation
Results
Farmville, NC 27828

Repairs to Greenfield Lake Amphitheater
Renovation
Results
$38,912 est. value
Wilmington, NC 28401

Carroll South
New Construction, Infrastructure - 30,000 SF
Pending Verification
$140,000,000 CJ est. value
Greensboro, NC 27401

Lakeshore Corporate Park
New Construction, Infrastructure - 660,000 SF
Pending Verification
$49,000,000 CJ est. value
Kannapolis, NC 28082

Robeson County Planetarium
New Construction
Conception
$5,000,000 est. value
Lumberton, NC 28358

ArtsCenter
Renovation, Infrastructure - 17,864 SF
Design
$3,000,000 CJ est. value
Carrboro, NC 27510

RFP Construction Manager-at-Risk - Stevens Center Renovation Phase 1 and Water Intrusion, Building Envelope, HVAC and Fire Suppression
Renovation
Post-Bid
$29,800,000 CJ est. value
Winston Salem, NC 27101

Seasonal Ice Rink at Red Hat Amphitheater
Renovation
Results
$123,750 est. value
Raleigh, NC 27601

Last Updated 01/25/2023 04:21 PM
Project Title

Performing Arts Centers (PAC) Architectural Fabric Awnings 2

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27601   (Wake County)
Category(s) Entertainment/Recreation
Sub-Category(s) Theaters/Auditoriums
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $390,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

After Bids are opened, the Owner shall evaluate them in accordance with the methods and criteria set forth in the Instructions to Bidders. The Owner/City Council reserves the right to waive any informality or to reject any or all Bids. Unless all Bids are rejected, Award will be made to the lowest responsible and responsive Bidder, taking into consideration quality, performance and the time specified in the Bid Form for the performance of the Contract. No bid may be withdrawn for ninety (90) days after the scheduled closing time for bids. The Owner reserves the right to reject any or all bids and to waive informalities. The Project consists generally of the following major items: The Contractor, at its own proper cost and expense and with skill and diligence, shall furnish all labor, tools, materials, equipment, Architectural Drawings, Permitting and do all things necessary to complete the following awning projects at the Raleigh Performing Arts Center: Awning #1 Box Office in front of Memorial Auditorium. Current awning structure to be removed and replaced. New structure will match existing structures in front of Fletcher Theater and Meymandi Concert Hall, utilizing the samestyle, materials and color. Fabric Awning will be of equal quality to that used in the Fletcher and Meymandi awnings. Awning #2 Fletcher Theater Entrance. Replace architectural fabric awning on existing metal frame. Awning #3 Meymandi Concert Hall Entrance. Replace architectural fabric awning on existing metal frame. Awning #4 Administrative entrance on Wilmington St. Replace architectural fabric awning on existing metal frame. Add metal framing to remove the scalloped look. Awning #5 Fletcher Theater Stage Entrance. Replace architectural fabric awning on existing metal frame. Awning #6 Memorial Auditorium Stage Entrance. Replace architectural fabric awning on existing metal frame. Repair existing metal frame. Awning #7 Meymandi Concert Hall Stage Entrance. Replace architectural fabric awning on existing metal frame. Awning #8 Employee Entrance on Salisbury St. New awning structure and architectural fabric awning to be installed over employee entrance. Awning to resemble style of awning 5, 6, and 7, but scaled to fit Employee Entrance. Question regarding this solicitation should be directed to John Long, no later than 11:59 PM on January 6, 2023. Answers to questions will be published on NC IPS in an Addendum to this request for bids. Send questions electronically, to: John.Long@RaleighNC.gov. The City reserves the right to reject any or all proposals and to waive informalities. Bidders will be required to show evidence that they are licensed to perform the work in the Bidding Documents as required by North Carolina General Statute, Chapter 87 and the Instruction to Bidders. Pursuant to General Statutes of North Carolina Sections 143-128.2 and 143-131, and in accordance with City policy, the City of Raleigh encourages and provides equal opportunity for certified Minority and Woman-Owned Business Enterprise (MWBE) businesses to participate in all aspects of the City's contracting and procurement programs to include Professional Services; Goods and Other Services; and Construction. The prime contractor will be required to identify participation of MWBE businesses in their Bid, and how that participation will be achieved. Furthermore, the City's goal is to contract or sub-contract fifteen percent (15%) of the contract amount to certified MWBEs on construction projects over $300,000, or with contracts that include $100,000 or more in state funding. Owner will authorize a contingency of 10% of the total bid (less tax and freight).

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Foodservice Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Broadcast, Theater, and Stage Equipment, Recreational Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems.
Division 28 - Electronic Safety and Security, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents