Similar Projects
Social and Behavioral Sciences Building Renovation and Code Compliance - California State University - Dominguez Hills
Renovation - 34,900 SF
Conception
$21,553,000 CJ est. value
Carson, CA 90747

Sierra Hall Renovation - California State University - Northridge
Renovation - 100,000 SF
Conception
$138,439,000 CJ est. value
Northridge, CA 91330

AltaSea Marine Research Center - Phase 1B
Renovation
Design
$175,000,000 CJ est. value
San Pedro, CA 90731

20th Street Medical Research Center / Santa Monica
New Construction, Infrastructure - 67,513 SF
Design
$39,000,000 CJ est. value
Santa Monica, CA 90404

Boelter Hall 3rd Floor Robotics Department Renovation
LEED Certification, Renovation - 8,465 SF
Bidding
$6,548,000 CJ est. value
Los Angeles, CA 90095

RFP Construction Manager at Risk - UCLA Gayley Towers Redevelopment
Demolition, New Construction, Infrastructure
Bidding
$83,500,000 CJ est. value
Los Angeles, CA 90024

RFQ Contractor - Cogeneration Chilled Water Basin Waterproofing Repair
Renovation
Sub-Bidding
$550,000 CJ est. value
Los Angeles, CA 90095

Los Angeles Valley College Academic Complex 1
New Construction, Infrastructure - 80,000 SF
Post-Bid
$60,000,000 CJ est. value
Los Angeles, CA 91401

RFQ D/B - Los Angeles Valley College Demolition of Theater Arts Building
Demolition, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Los Angeles, CA 91401

CLA Tower And Registration Buildings Demolition Project
Demolition, Infrastructure
Results
$9,068,000 est. value
Pomona, CA 91768

Cosmetology Power Upgrade Project
Renovation
Results
$57,693 CJ est. value
Pasadena, CA 91106

The Pepperdine Student Recreation and Event Center (The Mountain at Mullin Park)
New Construction, Infrastructure
Construction
$250,000,000 CJ est. value
Malibu, CA 90265

El Camino Community College - Music Theater and Arts Complex
Demolition, New Construction, Infrastructure
Pending Verification
$22,386,000 CJ est. value
Torrance, CA 90503

Beverly Robertson / Mixed-Use
New Construction, Infrastructure - 271,000 SF
Pending Verification
$147,000,000 CJ est. value
West Hollywood, CA 90048

Faculty Staff Housing, Phase 2 - California State University - Northridge
New Construction, Infrastructure
Conception
$73,560,000 CJ est. value
Northridge, CA 91330

Last Updated 01/08/2024 05:05 AM
Project Title

Molecular Science Building 3rd Floor Lab Modernization

Physical Address View project details and contacts
City, State (County) Los Angeles, CA 90024   (Los Angeles County)
Category(s) Education, Laboratory
Sub-Category(s) College/University, Laboratory
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $3,757,886 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Department of Chemistry and Biochemistry proposes to renovate the existing Molecular Sciences Building (MSB) 3rd floor rooms 3221, 3221LB, 3221A, 3426, 3225, 3225LB, 3235, 3235LB, 3235A, 3436, and 3440 into one organic chemistry research lab. The renovated lab would be capable of accommodating approximately twenty students/researchers and handle the projected volume of procedures and experiments required for current and future research needs. The project area is 4,675 ASF (5,060 gsf) located on the west side of the northeast wing of the building. MSB is an eight-story, 97,654 ASF (178,666 GSF) lab and office building constructed in 1993. The project scope includes reconfiguration of the entire laboratory space, including demolition of existing fume hoods and installation of (20) University Furnished/Contractor Installed fume hoods. Additional work includes reconfiguration of existing mechanical ductwork system and rerouting of existing plumbing and electrical utilities to accommodate the proposed program. If Alternate No. 1 is not taken, Contractor shall patch and repair the existing infill panels within the storefront where perpendicular walls are to demolished under the base bid B License (General Building) The estimated construction cost is $3,757,886.00 LICENSE REQUIREMENTS: The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour) and shall comply with all applicable federal, state and local working condition requirements. The project area is 4,675 ASF (5,060 gsf) located on the west side of the northeast wing of the building.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Laboratory Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents