Similar Projects
Last Updated | 12/07/2020 11:32 PM |
Project Title | Rockstream Drive Assesssment District - 2020 |
Physical Address | View project details and contacts |
City, State (County) | Madison, WI 53719 (Dane County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sanitary Sewers, Storm/Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,136,420 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work under this contract shall include, but is not limited to, installation sanitary sewer main, laterals, water main and services, storm sewer structures and pipes, culverts, base preparation, curb and gutter, asphalt pavement, sidewalk, shared-use path, driveway aprons, and pavement marking. The project limits for the work to construct the extension of Rockstream Drive are from the existing end of Rockstream Drive to Maple Grove Drive. The street is approximately 2,300 ft. in length. The project limits for the work to construct the extension of Ambleside Drive are from the existing end of Ambleside Drive to Rockstream Drive. The street is approximately 200 ft. in length. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |