Similar Projects
Last Updated | 02/21/2022 09:54 AM |
Project Title | Provision of Middle Yellow River Interceptor Sewer |
Physical Address | View project details and contacts |
City, State (County) | GA (Gwinnett County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work for the Middle Yellow River Interceptor project includes the installation of approximately 2,400 feet of 24-inch DIP and 100 feet of 8-inch DIP gravity sewer along the Yellow River and Riverside Drive, installation of approximately 8 manholes, installation of approximately 75 feet of 6-inch and 1,100 feet of 8-inch DIP water mains, three fire hydrant assemblies, connection to two existing water mains, a river crossing of the Yellow River, installation of a temporary access driveway, installation of sewer service connections, restoration of concrete flumes, sidewalk replacement, curb and gutter replacement, roadway reconstruction, driveway cut repair, replacement of existing CMP storm drains with RCP piping, traffic control, bypass pumping, site restoration and clean-up, preparation of record drawings, and all related appurtenances for a complete and functioning system as shown on the Drawings or specified. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |