Similar Projects
Playa Drain Trail Phase II - Segment 2
Alteration
Bidding
El Paso, TX

Chuck Heinrich and Mary Frances Keisling Trailhead Improvements
Infrastructure
Bidding
$200,000 to $250,000 est. value
El Paso, TX

Transit System Site Improvements
Post-Bid
El Paso, TX

Tornillo Guadalupe International Bridge (TGIB) Sidewalk Repair Project
Post-Bid
El Paso, TX

ADA Compliant Sidewalk - Building 20709
Results
$25,000 to $100,000 est. value
El Paso, TX

El Paso Parking Lot Repair
Results
El Paso, TX 79915

Old Dominion Freight Line - Parking Lot Expansion
Addition, Demolition
Construction
El Paso, TX 79905

Canterbury Trail Improvements
Infrastructure
Bidding
$1,300,000 to $1,500,000 est. value
El Paso, TX 79902

Wainwright and North East Basin Park Improvements - Capital Improvement
Post-Bid
$625,000 to $725,000 est. value
El Paso, TX

El Paso Hondo Pass Parking Lot Repair
Results
El Paso, TX 79904

Playa Drain Trail Phase II - Capital Improvement
Infrastructure
Bidding
$1,200,000 to $1,400,000 est. value
El Paso, TX 79907

Montana RTS Pedestrian Enhancements
Results
$2,000,000 to $2,800,000 est. value
El Paso, TX 79901

Pedestrian Safety Improvements
Results
Less than $1,727,783 est. value
TX

Modify Existing Ramps, Signing and Pavement Markings
Results
Less than $2,024,004 est. value
TX

Central Business District Phase IV
Results
$13,500,000 to $14,500,000 est. value
El Paso, TX 79821

Last Updated 06/03/2021 06:03 PM
Project Title

Gene Torres NTMP Improvements

Physical Address View project details and contacts
City, State (County) El Paso, TX   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Gene Torres NTMP project consists of installing traffic circles along 4 intersections as well as improving the ADA accessibility, upgrading sidewalk and parkway. Bike lane and left turn lane signage and striping along Gene Torres from Pellicano to Vista Del Sol. The project also includes 3 medians; 2 medians along Gene Torres and 1 along Scott Simpson. Access to all properties must be provided during construction. Final surface must provide Ppositive sheet flowt the end completion of project. Base Bid I consists of the demolition of the intersections Gene Torres at Scott Simpson & at Gene Torres at Jim Thorpe including: concrete curb & gutter (standard), sidewalks, ramps, existing landscaping, trees, and concrete parkway. Roadway improvements include mill and inlay, traffic circles, concrete sidewalks, 6” standard curb and gutter, 4” rolled curb, ADA ramps, proposed landscaping, and illumination. Traffic improvements include the removal of existing signs and installing new signs for traffic circles as well as new pavement striping. This base bid will include the left turn lane from Gene Torres to Henry Phipps as well as the transition median east of the intersection. Utility improvements consist one fire hydrant. Additive Alternate I consists of 3 medians; 1 median along Scott Simpson between George Dieter and Greg Powers and 2 medians along Gene Torres between Pellicano and Prado del Sol & Sierra Morena and Sierra Azul . The demolition consists of asphalt and base. Roadway improvements include the installation of the median, 6” standard curb and gutter, ADA ramps, proposed landscaping and illumination. Traffic improvements include the removal of existing sign and pavement markings & proposed signs and pavement markings.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents