Similar Projects
Pavement Grooving and Polyurea Painting
Bidding
Alton, Bangor, Benton, Clinton, Cumberland, Fairfield, Falmouth, Oakland, Old Town, Orono, Palmyra, Pittsfield, Veazie, Waterville, Yarmouth, ME

Presidential Lane Extension
Bidding
Sanford, ME 04073

Road Resurfacing, Reclamation, and Other Road Repair Services
Post-Bid
Portland, ME

Paving 2021 - Road Resurfacing, Reclamation, and Other Road Repair Services
Term Contract
Post-Bid
Naples, ME

Pavement Milling, Hot Mix Asphalt Overlay, Bridge Work with Drainage and Safety Improvements
Results
Falmouth, Portland, South Portland, ME 04105

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Westbrook, ME

2021 CIP Paving and Street Rehabilitation
Post-Bid
Casco, ME

Scott Dyer Road Improvements Phase 3
Results
Less than $580,000 est. value
Cape Elizabeth, ME

Route 302 and Route 35 Improvements Project
Results
Naples, ME

Brighton-Deering-Falmouth Intersection Roundabout Project
Results
Less than $4,300,000 est. value
Portland, ME

Pavement Rehabilitation, Guardrail and Clear Zone Improvements MM 35.3 to MM 42.0
Results
Less than $8,300,000 est. value
Saco, Scarborough, ME

2020 Tuttle Road Sidewalk Extension and Road Realignment
Results
Cumberland, ME 04021

Pavement Milling, Hot Mix Asphalt Overlay With Drainage and Safety Improvements
Results
$1,667,000 est. value
Portland, ME 04101

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Alfred, Arundel, Biddeford, Lyman, ME 04002

Safety Improvements/Located on I-295
Results
Less than $2,112,000 est. value
Falmouth, Yarmouth, ME 04105

Last Updated 04/22/2021 11:13 PM
Project Title

Crack Sealing

Physical Address View project details and contacts
City, State (County) Baldwin, Biddeford, Cornish, Gorham, Limerick, Limington, Old Orchard Beach, Saco, Scarborough, Standish, Westbrook, Windham, ME (Cumberland, York Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $173,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: In Cumberland & York Counties: Project 18995.14 Priority 1 is located on Route 11 in Limerick and Limington from Prospect Street northeast to Route 117. Priority 2 is located on Route 5 in Limerick and Cornish 0.31 miles South of Town Line north to Route 25. Priority 3 is located on Route 114 in Standish from Route 35 northwest to Joy Lane. Priority 4 is located on Route 113 in Standish and Baldwin from Route 25 to Route 5. Project 25669.00 Priority 1 is located on Jefferson Street in Biddeford from South Street to Alfred Street. Priority 2 is located on Pine Street in Biddeford from the bridge deck joint to Elm Street. Priority 3 is located on Beach Street in Saco from Main Street to Old Orchard Road. Priority 4 is located on Spring Street in Saco from North Street to Lincoln Street. Priority 5 is located on Garfield Street in Saco from North Street to Cherryfield Avenue. Priority 6 is located on Falmouth Road in Windham from the Falmouth town line to Albion Road. Priority 7 is located on New Portland Road in Gorham from Lowell Road to the Westbrook city line. Priority 8 is located on Libby Avenue in Gorham from New Portland Road to Main Street. Priority 9 is located on Payne Road in Scarborough 0.14 miles north ofMilliken Road to Beech Ridge Road. Priority 10 is located on Payne Road in Scarborough 2000' north of Beech Ridge Road to 300' north of Bonney Grove Drive. Priority 11 is located on Payne Road in Scarborough from Ginn Road to Mussey Road. Priority 12 is located on Spurwink Road in Scarborough from Acorn Lane to Blackpoint Road. Priority 14 is located on Broadtum Road in Scarborough 100' west of Diner Drive to Martin Avenue. Priority 14 is located on Broadtum Road in Scarborough from Martin Avenue to Carpenter Court. Priority 15 is located on Main Street in Biddeford from 660' west ofMount Pleasant Street to South Street. Priority 16 is located on Forest Street in Westbrook from Rochester Street to Main Street. Priority 17 is located on Stroudwater Street in Westbrook from Forest Street to 1550' south of Laffin Drive. Priority 18 is located on East Bridge Street in Old Orchard Beach from Old Orchard Street to Walnut Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents