Similar Projects
2020 Plant Mix
Bidding
Less than $4,188,000 est. value

Parking Lot Repaving
Bidding
Arlington, VA

Concrete Work at Multiple Installations
Post-Bid
$20,000,000 to $40,000,000 est. value
Washington, DC - Arlington, Bowling Green, Fort Belvoir, VA

Arlington National Cemetary - Mcpherson Roads Reconstruction
Post-Bid
$10,000,000 to $25,000,000 est. value
Arlington, VA

George Washington Memorial Parkway
Results
Arlington, VA

Street Construction Improvements
Results
$1,363,000 est. value
Arlington, VA 22201

ANC McPherson Area Road Reconstruction
Post-Bid
$10,000,000 to $25,000,000 est. value
Arlington, VA

2019 Latex Modified
Results
Less than $2,397,000 est. value

2019 Slurry Seal
Results
Less than $990,000 est. value

2019 Surface Treatment
Results
Less than $458,000 est. value

2019 Latex Modified
Results
Less than $2,191,000 est. value

On-Call Interstate Asphalt Concrete Patching
Results
Less than $847,000 est. value

2019 Plant Mix
Results
Less than $5,078,000 est. value

2019 Plant Mix
Results
Less than $1,686,000 est. value
VA

High Friction Surface Treatment Paving
Results
Less than $925,000 est. value

Last Updated 08/20/2019 12:36 PM
Project Title

27th Street South and Crystal Drive Lane Conversion

Physical Address View project details and contacts
City, State (County) Arlington, VA   (Arlington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,155,423
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Construction work to convert 27th Street South and Crystal Drive from one -way to two-way travel lanes. The project includes the removal and installation of 970 LF of Arlington cCunty standard curb and gutter; 65 LF of VDOT standard curb and gutter; 410 SY of concrete sidewalk; 6,275 SY of asphalt milling, 285 Ton of VDOT bm-25.0a, 755 Ton of VDOT sm-9.5d, traffic signal work, pavement marking, signage, streetlights, removing and installing storm sewer structures and pipes, waterproofing the top of the underground structures, expansion joint, and other components or incidentals.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents