Last Updated | 03/02/2023 12:02 AM |
Project Title | SR 81 at Dried Indian Creek in Covington |
Physical Address | View project details and contacts |
City, State (County) | Covington, GA 30016 (Newton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed project would construct a replacement bridge carrying SR 81 over Dried Indian Creek. The bridge would be replaced at its existing location. Traffic would be maintained via an off-site detour during construction. Motorists traveling along SR 81 between Covington and Oxford would have to detour around the project location during construction using SR 12, I-20, and SR 162 that is approximately 19.5 miles long. The proposed structure would be approximately 68.0 feet long by 53.42 feet wide. This proposed bridge typical section includes three 12-foot lanes, and a 2-foot shoulder and 5.5-foot sidewalk on both sides. The proposed roadway approaches would consist of three 12-foot lanes, and 30 curb and gutter, 2 foot grass strip, and 5 foot sidewalk on both sides. The replacement bridge is proposed to be skewed approximately 25 degrees from normal to better align the opening with the direction of flow during storm events. County: Newton As of March 02, 2023, the project is in Final Planning status. Anticipated letting Month is June, 2023. GADOT - SR 81 at Dried Indian Creek in Covington *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |