Similar Projects
Old Route 7 Multi-Use Path and Related Work
Results
Less than $600,000 est. value
Great Barrington, MA

Western Ma Road and Trail Improvements
Results
$4,000,000 est. value
Franklin, Hampden, Worcester, MA

Tyler Street Streetscape
Results
$5,400,000 est. value
Pittsfield, MA 01201

Remove and Replace Existing Portland Cement Concrete Entrance Plaza and Sidewalks
Results
$67,230 est. value
North Adams, MA

Curbside Bike Lane
Results
$120,000 est. value
Pittsfield, MA

Complete Streets Sidewalks
Results
$772,740 est. value
Pittsfield, MA

Sidewalk Repairs and Improvements at Various Locations
Infrastructure
Results
$175,000 est. value

Town of Great Barrington Phase 2 Downtown Area Roadway Improvements Project
Infrastructure
Results
$1,400,000 est. value
Great Barrington, MA

Streetscape Maintenance
Infrastructure
Post-Bid
$50,000 est. value
Pittsfield, MA

Streetscape Maintenance
Infrastructure
Post-Bid
$150,000 est. value
Pittsfield, MA

Lenox Sidewalk Improvements and Related Work
Infrastructure
Post-Bid
$92,025 est. value
Lenox, MA 01240

School Curbs and Sidewalks Project
Infrastructure
Post-Bid
$400,000 est. value
Lee, MA 01238

Pedestrian Safety Improvements Along Walker Street
Alteration
Results
$500,000 est. value
Lenox, MA 01240

Concrete Curb and Sidewalk Repair and Placement
Infrastructure
Post-Bid
$220,000 est. value
Lee, MA

Installation of Barkerville Parking Area
Infrastructure
Post-Bid
$30,000 est. value
Pittsfield, MA

Reported 06/24/2022 12:00 AM
Project Title

Summer Street Sidewalk Replacement and Related Work

Physical Address View project details and contacts
City, State (County) Lanesborough, MA 01237   (Berkshire County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $335,100 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Summer Street Sidewalk Replacement and Related Work. Work includes removing and replacing approximately 2,165 feet of deteriorating sidewalks and related work from South Main Street (Rt. 7) to Lanesborough Elementary School.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents