Similar Projects
Epoxy Floor Coating Asset Management Department
Alteration
Bidding
Tulsa, OK

Furnish/Install Carpet/Tile at the Senior Center
Alteration
Bidding
Edmond, OK 73003

Gym Floor Replacement for Bid Package 1 - Gym Flooring
Post-Bid
Oktaha, OK

Career Planning Center Interior Flooring Remodel
Alteration
Post-Bid
$45,445 est. value
Oklahoma City, OK 73109

Carpet and Flooring Installation
Results
Oklahoma City, OK

20N 002 Flooring
Term Contract
Results
Oklahoma City, OK 73145

New Flooring and Installation
Alteration
Post-Bid
Oklahoma City, OK

Concrete Floor Project at District 1
Alteration
Results
OK

Library Flooring - Installation
Alteration
Post-Bid
Lindsay, OK 73052

Colvin Center Mac Gym - Indoor Turf and Flooring Replacement
Term Contract
Post-Bid
Stillwater, OK 74074

Keystone New Flooring
Alteration
Post-Bid
Sand Springs, OK

Floor Epoxy
Term Contract
Post-Bid
Oklahoma City, OK 73159

Gym Flooring Replacement
Alteration
Post-Bid
Council Hill, OK

Remove and Replace Carpet - Various County Buildings
Alteration
Post-Bid
OK

Willard Patios Tile Replacement
Alteration
Post-Bid
Stillwater, OK

Reported 10/27/2021 12:00 AM
Project Title

Replace Exterior Carpet

Physical Address View project details and contacts
City, State (County) Enid, OK 73703   (Garfield County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The exterior carpeting at facility 713 has reached the end of its useful life. The contractor will replace existing broadloom exterior carpet and existing traction strips on all outdoor portions of the facilities. This work is to include exterior carpeting on all outdoor porches, stairways and walkways of the first and second floor. Additional details are described below: a. Remove existing broadloom exterior carpet, traction strips and transition strips. b. Prepare surfaces for installation of new materials. c. Install new broadloom exterior carpet. d. Install new traction strips at nosing of exterior stairs. e. Install new transition strips as needed between flooring materials where change in level will exceed 1/4"

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents