Similar Projects
Canyon Wren Townhomes - General Contractor Bids Needed
New Construction, Infrastructure - 30,000 SF
Design
$7,000,000 CJ est. value
Moab, UT 84532

UT NP MULTI PMS(2) & NV NP GRBA PMS(1), Pavement Preservation Southern Utah and Pavement Preservation Great Basin
Infrastructure
Design
$10,000,000 CJ est. value
Moab, UT 84532

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Moab Regional Hospital Bid Package 1
New Construction, Alteration
Post-Bid
Moab, UT 84532

RFQ Contractor - La Sal Mountain Loop Road
Infrastructure
Post-Bid
$30,000,000 CJ est. value
Moab, UT 84532

US-191 - SR-279 to Seven Mile Wash
Infrastructure
Results
$6,000,000 to $10,000,000 est. value
Moab, UT 84532

US-191; La Sal Junction to Moab
Infrastructure
Results
$1,500,000 to $3,000,000 est. value

The Jailhouse Cafe Expansion
Addition, Demolition, Infrastructure - 16,128 SF
Pending Verification
$2,500,000 CJ est. value
Moab, UT 84532

The Jailhouse Cafe Expansion
Addition, Demolition, Infrastructure - 16,128 SF
Pending Verification
$2,500,000 CJ est. value
Moab, UT 84532

Asphalt Paving - Arches National Park
Infrastructure
Post-Bid
$250,000 CJ est. value
Moab, UT 84532

56--Roadway Dust Control Treatment
Term Contract
Results
Moab, UT

Aggie Apartments Phase I
New Construction, Infrastructure - 113,558 SF
Pending Verification
$124,000,000 CJ est. value
Moab, UT 84532

The Lost Springs Apartments
New Construction, Infrastructure - 72,824 SF
Post-Bid
$30,000,000 CJ est. value
Moab, UT 84532

US-191; Passing Lane, MP 153.0 to MP 157.0
Infrastructure
Results
$3,000,000 to $4,000,000 est. value
UT

Lionsback Resort
New Construction, Infrastructure
Pending Verification
$350,000,000 CJ est. value
Moab, UT 84532

Last Updated 03/08/2023 02:03 PM
Project Title

US-191; Various Location from Moab to MP 151 Preservation High Volume

Physical Address View project details and contacts
City, State (County) Moab, UT 84532   (Grand County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,107,920 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County: Grand This Project Requires Using the Electronic Certified Payroll Program. See Attachment to Notice to Contractors. This is a P+t (Price + Time) Project. The Department Will Not Hold Retention on This Project. Per Utah State Code A 13-8-5 (1) Prime Contractors Cannot Hold Retention. Refer to Utah Code A 13-8-5 (1) for More Information. Wage Rates: Apply Engineer's Estimate: Greater than $500K but less than or equal $1.5M Project Location: US-191; Various Location from Moab to MP 151 The principal items of work are as follows (for all items of work see attachment): Emulsified Asphalt (Micro) Micro-Surfacing Traffic Control The project is to be completed: to be determined by competitive bid. Project information can also be reviewed at the main office in Salt Lake City, its Region offices, and its District offices in Price, Richfield, and Cedar City. Each bidder must submit an electronic bid bond from an approved surety company using UDOT's Electronic Bid System (EBS); or in lieu thereof, cash, certified check, or cashier's check for not less than 5% of the total amount of the bid, made payable to the Utah Department of Transportation, showing evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract bonds as required. The right to reject any or all bids is reserved. Additional information may be secured at the office of the Utah Department of Transportation, (801) 965-4346 UDOT - US-191; Various Location from Moab to MP 151 Preservation High Volume *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents