Similar Projects
2019 Beach Fill
Post-Bid
North Wildwood, NJ 08260

2019 Back Beach Fill
Post-Bid
Wildwood Crest, NJ 08260

Shooting Island Living Shoreline and Oyster Habitat Construction
Results
Ocean City, NJ 08226

City of Wildwood for the Susquehanna Avenue and Dock Street End Bulkhead Replacement
Results
Wildwood, NJ 08260

Ocean, Pavilion & Central Avenues Drainage & Road Project
Post-Bid
Cape May Point, NJ 08212

Stone Seawall Repair Hereford Inlet, NJ
Results
$5,000,000 to $10,000,000 est. value
North Wildwood, NJ

Maintenance Timber/Underwater/ Drainage Structural Repair Contract, South - 2019
Results
$5,000,001 to $10,000,000 est. value

Drainage Restoration Contract, Statewide-2018; Various Sites Statewide
Results
$5,000,001 to $10,000,000 est. value

Lake Lily Park Contract No 1 - Bulkhead
Results
Cape May Point, NJ 08212

Reconstruction of Sumner Avenue
Results
Woodbine, NJ 08270

Immediate and Scheduled Repairs of Drainage Structures and Underground Facilities
Results

Beach Nourishment, Cape May Inlet to Lower Township, Cape May, NJ
Results
$10,000,000 to $20,000,000 est. value
Cape May, NJ 08204

Townsends Inlet to Cape May Inlet, Cape May County, New Jersey
Results
$5,000,000 to $10,000,000 est. value
Cape May, NJ

West Side Emergency Drainage Improvements Portions of 15th, 16th and Delaware Avenue
Results
North Wildwood, NJ

Hope Corson Road (C.R. 671) Phase II
Results
NJ

Reported 04/04/2019 12:00 AM
Project Title

2019 Bulkhead & Street End Improvements

Physical Address View project details and contacts
City, State (County) North Wildwood, NJ 08260   (Cape May County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description The project at the bay front streets ends 12th and 13th Avenues along Hoffman Canal includes the construction of new vinyl bulkheads, with new timber piles, timber wales, new tie-back system, storm drainage improvements, new reinforced concrete cap, floodwall, footing with concrete fill and restoration of disturbed areas. The project at the bay front streend end of 1st Avenue along Beach Creek includes the reinforcement of the existing vinyl bulkhead with a new reinforced concrete cap, floodwall, footing with concrete fill, storm drainage repairs and improvements, roadway reconstruction and restoration of disturbed areas. The project at the bay front streend end of 11th Avenue along Hoffman Cancan includes the construction of a new vinyl bulkhead, with timber biles and timber sale,s reinforcement of the existing vinyl bulkhead with a new reinforced concrete cap, floodwall, footing with concrete fill, storm drainage improvements, and restoration of disturbed areas.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents