Similar Projects
Blow Pierce Elementary School Elevator Addition
Addition
Design
$900,000 est. value
Washington, DC 20002

Minor Kitchen Renovations
Renovation
Post-Bid
Washington, DC 20011

General Building Maintenance and Repairs
Renovation
Post-Bid
Washington, DC

Design-Build Services for John W. Ross Elementary School
Renovation
Results
$5,010,357 est. value
Washington, DC

Construction Management At-Risk Services for School Within a School at Goding Elementary School
Results
Washington, DC 20002

Construction Manager at-Risk Services West Elementary School
Construction
Washington, DC

Smothers Elementary School
Addition - 22,000 SF
Construction
$30,000,000 est. value
Washington, DC 20019

The River School
New Construction, Renovation - 54,088 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20016

Rhode Island Avenue NE Mixed Use
New Construction - 156,000 SF
Pending Verification
Washington, DC 20018

Design-Build Services for Garfield Elementary School
Renovation - 76,000 SF
Post-Bid
$48,000,000 est. value
Washington, DC 20020

Construction Management at-Risk Services for Smothers Elementary School
Results
$38,800,000 est. value
Washington, DC 20019

Design-Build Services for Dorothy Height Elementary School
Renovation - 93,000 SF
Post-Bid
$51,000,000 est. value
Washington, DC 20011

Design-Build Services for Bard High School Early College
Results
Washington, DC 20032

Design-Build Services for Aiton Elementary School
Renovation, Addition - 74,000 SF
Post-Bid
Washington, DC 20019

Design-Build Services for Raymond Elementary School
Results
Washington, DC 20010

Last Updated 05/26/2022 12:34 PM
Project Title

Design-Build Services for School Without Walls at Francis Stevens Education Campus

Physical Address View project details and contacts
City, State (County) Washington, DC 20037   (District of Columbia County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes a complete renovation of the existing historic building as the base scope of work. Offerors shall also include in their base design services anew construction addition that shall be priced as an add alternate for construction. This add alternate scope shall include removing the existing temporary trailers currently on-site in order to accommodate the new addition. both the base renovation scope and add alternate addition total to 126,000 gross square feet of modernized learning space, with approximately 109,000 gross square feet in the existing building and 17,000 gross square feet in the add alternate addition

Details

Elementary School, Renovation, Middle/Senior High School, Addition, Middle/Senior High School, Approximately 109,000 SF Renovation, Middle/Senior High School, 17,000 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents