Similar Projects
District 3 - Scheduled and Emergency Standpipe and Fire Safety Systems Inspection, Testing and Repairs at Various Locations
Alteration
Bidding
$159,000 est. value

Worcester State University - Fire Pump Replacement, Dowden Hall
Post-Bid
$135,000 est. value
Worcester, MA 01602

Longsjo School Fire Protection
Post-Bid
Less than $165,000 est. value
Fitchburg, MA 01420

Hastings Elementary School Automatic Sprinkler and Fire Alarm Upgrades - General Bid
Results
$995,000 est. value
Westborough, MA 01581

Hastings Elementary School Automatic Sprinkler and Fire Alarm Upgrades - Filed Sub Bids
Results
$995,000 est. value
Westborough, MA 01581

Fire Alarm System Testing, Maintenance and Repair Services
Term Contract
Post-Bid
Fitchburg, MA

New Sprinkler Service to the Bryn Mawr Elementary School
Results
$350,000 est. value
Auburn, MA 01501

Inspection, Testing, Maintenance of Fire Preventive Systems
Post-Bid

Maintenance and Repairs to The Existing Fire Alarm System
Term Contract
Results
$55,720 est. value
Westborough, MA 01581

Sprinkler Upgrade
Alteration
Post-Bid
Rutland, MA 01543

Fire Alarm Testing and Repairs Service Contract
Results
Less than $49,999 est. value
Clinton, MA 01510

Fire Detection and Fire Suppression Systems Annual Inspection and Repair
Term Contract
Post-Bid
$20,000 est. value
Shrewsbury, MA

Fire Alarm System at John Augustus Hall
Results
$315,000 est. value
West Boylston, MA 01583

Fire Alarm Replacement at Winchester Town Hall and Department of Public Works Facility
Alteration
Post-Bid
$270,000 est. value
Winchendon, MA

Longsjo School Attic Sprinkler System Upgrade
Results
Fitchburg, MA 01420

Last Updated 12/07/2021 03:01 PM
Project Title

Fire Alarm Upgrades, Tucker Building 705-1

Physical Address View project details and contacts
City, State (County) Baldwinville, Templeton, MA 01436   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $63,124
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: New fire alarm system for the Tucker Apartment Building. Full or portions of the project may be impacted by the pandemic. The Notice To Proceed for this project may be issued as much as 90 days from the date DHCD approves the construction contract.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents