Similar Projects
2022 PCC Pavement Patching Program
Infrastructure
Bidding
$1,100,000 est. value
IA

East 30th Street and East University Avenue Intersection Improvements
Infrastructure
Bidding
$835,000 est. value
IA

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Post-Bid
West Des Moines, IA 50266

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Post-Bid
West Des Moines, IA 50266

8th Street SE Water and Sewer Extensions
Results
$1,463,902 est. value
Altoona, IA

8th Street SE Water and Sewer Extensions
Results
$1,463,902 est. value
Altoona, IA

5th Avenue and Grand Avenue One-Way to Two-Way Conversion
Infrastructure
Bidding
$1,600,000 est. value
Des Moines, IA 50982

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

Lew Clarkson Park Softball Complex Improvements
Renovation
Results
$570,000 est. value
Johnston, IA

PCC Pavement Widening
Infrastructure
Bidding
IA

South Grand Prairie Parkway - Stagecoach Drive to Grand Avenue
Infrastructure
Post-Bid
WDM, IA 50266

2021 PCC Street Patching Program
Infrastructure
Results
$446,625 est. value
Ankeny, IA

2021 Cowles Drive Reconstruction - Phase 2 and 3
Infrastructure
Bidding
$12,500,000 est. value
Des Moines, IA 50321

Polk Co Big Creek State Park Paving Overflow Parking
Infrastructure
Post-Bid
$1,250,000 est. value
IA

2021 HMA Residential Paving Program Contract 2
Infrastructure
Results
$800,000 est. value
Des Moines, IA

Last Updated 12/03/2021 09:45 AM
Project Title

South East Crosswinds Drive RISE - Phase 2

Physical Address View project details and contacts
City, State (County) Ankeny, IA 50021   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,780,342
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes construction of PCC pavement, related storm sewer, sanitary sewer, water main extension, subdrain, earthwork, ditching, and SWPP controls generally located on SE Convenience Drive, SE Corporate Woods Drive, and SE 90th Street east of I-35 and south of SE Corporate Woods Drive. The construction improvements include approximately 10,462 SY of 9” PCC pavement, 1,118 SY of 9” PCC pavement widening, 475 SY of 10” PCC pavement widening, 1,849 LF of 8” PVC sanitary sewer, 2,325 LF of 10” PVC C900 water main, 1,294 LF of 12” PVC C900 water main, 2,559 LF of RCP storm sewer, 29,416 CY of Class 10 excavation, subgrade preparation, modified subbase, subdrain and construction of sidewalk ramps. Other associated improvements include traffic control, erosion control, surface restoration, and miscellaneous associated work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents