Similar Projects
Highbanks Ravine Rehabilitation Project
Infrastructure
Bidding
$300,000 est. value
Saint Cloud, MN

Full Depth Reclamation (FDR), Culvert Replacement, Wear Courses, Topsoil
Infrastructure
Bidding
$300,000 est. value
Fergus Falls, MN

DNR1 Eckvoll WMA Culvert Installation
Post-Bid
Gatzke, MN 56724

Butler Road - Culvert Replacement
Post-Bid
MN

Directional Boring
New Construction
Results
Minneapolis, MN 55401

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

Judicial Ditch No. 414 Branch A40 Tile Improvement
Infrastructure
Bidding
$390,000 est. value
MN

Replacement of all Culverts, Full-Depth Reclamation, and Paving
Post-Bid
Baudette, MN

North Fork Zumbro River at Mazeppa Channel Restoration
Results
Wabasha, MN

Retaining Wall Repair and ADA Improvements
Infrastructure
Bidding
$3,000,000 est. value
New London, MN 56273

Watonwan and Brown County Judicial Ditch No. 18 Improvements Bid Package 3
Post-Bid
$407,000 est. value

2021 Einer Anderson Field Retaining Wall Replacement
Renovation
Results
Minnetonka, MN 55345

Cuyuna State Recreation Area Portsmouth Campground Trail
Infrastructure
Bidding
$120,000 est. value
Ironton, MN 56455

Road Materials
Post-Bid
Moorhead, MN

Pond Cleanout
Results
$205,000 est. value
Burnsville, MN

Reported 05/11/2022 12:00 AM
Project Title

Goose Prairie WMA Enhancement Project

Physical Address View project details and contacts
City, State (County) Hitterdal, MN   (Clay County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Goose Prairie WMA Enhancement Project will consist of ditch sediment removal, new ditch excavation, construction of a concrete control structure, and raising of a roadway to act as a dam embankment. The project will have approximately 42,000 CY of excavation, 9,400 CY of embankment, 3,100 CY of fine filter aggregate, CMP culverts, riprap installation, drainage improvements, hauling, seeding, and related work and incidental items.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents