Similar Projects
Contractor - John L. McClellan (JLM) Memorial Veterans Hospital | RAD Room Site Prep, Room 10
Renovation, Infrastructure
Design
$25,000 to $100,000 est. value
Little Rock, AR 72205

Construction of RMTC Nebraska Avenue Underground Electric
Infrastructure
Bidding
$1,147,986 CJ est. value
North Little Rock, AR 72199

Main St. - Vandenberg Blvd. (Widening) (Jacksonville) (F)
Infrastructure
Bidding
$500,000 CJ est. value
Jacksonville, AR 72076

Wellington Hills Apartments
New Construction, Infrastructure
Sub-Bidding
$85,000,000 CJ est. value
Little Rock, AR 72201

Double Tree Loop Driveway Vehicular Waterproofing Replacement
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Little Rock, AR 72201

The East End 2021 Water Improvements Contract - 2 Water Line Improvements
Infrastructure
Post-Bid
North Little Rock, AR 72100

Sherwood Public Works Site Development Phase 2
Infrastructure
Post-Bid
Sherwood, AR

Stone Links - Multi-Pipe Maintenance Rehabilitations
Infrastructure
Results
North Little Rock, AR

North Locust Street 20 Water Main Installation
Infrastructure
Results
$2,210,199 est. value
North Little Rock, AR 72115

Quapaw Subdivision - Master Plan
New Construction
Pending Verification
North Little Rock, AR

Hwy. 161 Str. And Apprs. (Pulaski & Lonoke Cos.) (S)
Infrastructure
Bidding
$2,000,000 CJ est. value
Scott, AR 72142

Manhole Lids and Rings
Term Contract
Sub-Bidding
Little Rock, AR 72201

Highway 67 Water Line Relocation
Infrastructure
Post-Bid
Jacksonville, AR

LIT Vortac Relocation Access Drive and Site Grading (Harris Road)
Infrastructure
Results
Little Rock, AR 72223

Jacksonville Military Road Sidewalks Phase 2 (TAP-20) (S)
Infrastructure
Bidding
$350,000 CJ est. value
Jacksonville, AR 72076

Last Updated 08/04/2022 02:16 AM
Project Title

2 Inch Galvanized Water Main Replacements Little Rock 2022 Phase 4

Physical Address View project details and contacts
City, State (County) Little Rock, AR 72201   (Pulaski County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $1,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

2" galvanized water main replacements little rock 2022 phase 4 installation of potable water mains, approximately: 5,300 l.F. Of 6" d.I. And 700 l.F. Of 3" pvc harmon dr., blackwood rd., youngwood rd., crouchwood rd., and jewell rd. - little rock, ar Direct any bid questions to Tom Wray of Central Arkansas Water at (501) 377-1221 or at Thomas.Wray@carkw.com. All bids must be accompanied by a Certified Check or Bid Bond in an amount equal to at least 5% of the total bid. The Commission reserves the right to waive formalities, reject any or all bids, and to accept the bid deemed to serve the best interest of Central Arkansas Water. This publication was paid for by the Engineering Department of Central Arkansas Water at a cost of $297.60. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents