Similar Projects
MetroGreenscape
New Construction - 9,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Charlotte, NC 28134

Gaffney Property
New Construction - 550,000 SF
Conception
$10,000,000 CJ est. value
Charlotte, NC 28217

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Bidding
$500,000 to $20,000,000 est. value

Construction of the Valerie Woodard Center
New Construction
Bidding
Charlotte, NC 28208

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

Charlotte Water Zone 4 Field Operations Center
New Construction - 63,000 SF
Post-Bid
Charlotte, NC 28200

Air Force Contract Augmentation Program (AFCAP) V
Results

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Carmel Road Post Office Site
New Construction
Construction
$7,500,000 est. value
Charlotte, NC 28226

Construction of the Northern Regional Recreation Center CM at Risk Services
Construction
Charlotte, NC

The Maintenance Team Building
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Charlotte, NC 28217

Region 4 Single Award IDIQ Job Order Construction Contracts (JOCC) for Construction Services In States of AL, FL, GA, KY, MS, NC, SC, & TN
New Construction, Renovation
Design
$2,000 to $5,000,000 est. value

Davidson Public Facilities
Renovation, Addition - 51,500 SF
Post-Bid
Davidson, NC 28036

Last Updated 11/23/2021 03:38 PM
Project Title

Munitions Storage Area (MSA) Expansion

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28208   (Mecklenburg County)
Category(s) Commercial, Government/Public
Sub-Category(s) Misc. Buildings, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The 145th Airlift Wing intends to issue a solicitation and award a firm-fixed price contract to renovate/expand a munitions storage area subject to the availability of funds. This project includes but is not limited to demolition of an existing facility, construction of a 960 square foot administrative facility, a 1,800 square foot munitions storage facility, and 300 square foot maintenance and inspection area. Functional areas include administrative areas for training and support staff, equipment and maintenance rooms, storage spaces, communications room, mechanical and electrical utility rooms and latrine facilities. Work shall include site grading, site utilities, site paving, fencing, and fire protection. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. Additional items of note include providing temporary munitions storage area, blast requirements for doors, locks, and specialty hasps that need to be on the doors of the munitions storage facility and maintenance and inspection facility.

Details

,, 2,760 SF - 1 Warehouse/Storage, 1,800 SF Addition, 1 Misc. Buildings, 960 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents