Similar Projects
Kroger #118-01 - Site Work Only
New Construction
Design
Spring, TX 77388

Annual Requirements Contract for Directional Boring Services and Drill Shafts
Results
$313,905 est. value
Arlington, TX

Relocation and Leveling of Portable Buildings and Ramps
Results
Dallas, TX

Wesco Office Building - Site Work Package
New Construction
Construction
Austin, TX 78735

Air Center Distribution Center Detention Pond
New Construction
Construction
Houston, TX 77000

Firearms Training Facility Site Improvements
Results
Sherman, TX 75090

The Grid Phase II Pad Sites
New Construction
Construction
Stafford, TX 77477

Vintage Farms Subdivision Phase 2
Results
Less than $1,600,000 est. value
TX

Heb Parking Lot Expansion / Hike And Bike Trail
New Construction
Construction
Dallas, TX 75206

Arrowhead Farms Subdivision Phase 1
Results
Less than $1,700,000 est. value
Caldwell, TX 77836

O'Reilly Auto Parts Parking Lot Addition
New Construction
Construction
Sanger, TX 76266

Core Drilling Services
Results

Clements Ranch Phase 6 Excavation Improvements
New Construction
Construction
Forney, TX 75023

Clements Ranch Phase 5 Excavation Improvements
New Construction
Construction
Forney, TX 75023

Basketball Performance Facility
Construction
Nacogdoches, TX 75962

Last Updated 12/03/2019 07:33 AM
Project Title

Core Drilling Services

Physical Address View project details and contacts
City, State (County) Fort Worth, TX 76133   (Tarrant County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Perform pavement sampling, materials identification and soil testing services including, but not limited to: sampling of various types of pavement such as concrete with or without steel rebar, cement stabilized base, flexible base, hot mix asphaltic concrete, etc. in TxDOT’s Paris District. Specific locations will be identified on the IFB. Sampling of pavements will utilize Continuous Sampling Method per ASTM D1587 with 2 inch to 4 inch diameter Shelby Push Tubes extruded in the field unless otherwise directed. Four inch diameter tubes will typically be used. Depth of sampling will be 10 inches into sub grade or a total depth maximum depth of 48 inches.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents