Similar Projects
Replacement of the Sand Hill Water Storage Tank
Design
Less than $2,070,000 est. value
Cottekill, NY

Repairing of Gravity Roof Tanks Located at Various Developments Citywide
Alteration
Bidding
New York, NY

Elevated Water Storage Tank
Infrastructure
Bidding
Waterloo, NY

Water Storage Tank Replacement
Post-Bid
Less than $2,350,000 est. value
Pavilion, NY 14525

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

FAGE USA New Water Storage Tank Building
New Construction, Renovation
Construction
Johnstown, NY 12095

Four Corners Water District Storage Tank Repairs
Infrastructure
Bidding
Hopewell Junction, NY

Lake Water System Improvements Project - Contract No. 3 - Spray Aeration Treatment
Post-Bid
Less than $225,000 est. value
Round Lake, NY 12151

Water Storage Tank Replacement
Results
Tivoli, NY

Grover Cleveland Water Tower Rehabilitation
Infrastructure
Bidding
Buffalo, NY 14215

Water Storage Tank Improvement
Post-Bid
Wilson, NY 14172

Rehabilitation of the Winged Food Elevated Storage Tank
Results
Mamaroneck, NY 10543

Fluoride System Upgrade at Reeves Newsom Water Service Station
Post-Bid
Scarsdale, NY 10583

Reported 09/14/2021 12:00 AM
Project Title

Washwater Tank Pumpout

Physical Address View project details and contacts
City, State (County) Westhampton, NY   (Suffolk County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall access and pump out all contents within washwater holding tanks on the installation. There are three underground storage tanks used for washwater and the total holding capacity is 11,000 gallons. The contractor is responsible for emptying all three tanks as part of this contract. The location and access to the tanks will be granted by the Government after award of the contract. Contractor shall submit a certified report to the Government with the final total volume of washwater removed from the installation. Contractor shall be responsible for off-base disposal of the washwater contents to a permitted disposal site appropriately licensed by state or local authorities to handle the disposal. The Contractor shall provide documentation annotating the final disposition of the washwater.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents