Similar Projects
Barkley Extension - City of Albany
Infrastructure
Conception
$969,354 CJ est. value
Albany, GA 31705

North Washington Extension - City of Albany
Infrastructure
Conception
$250,000 CJ est. value
Albany, GA 31701

Oglethorpe Bridge / SR 520 BU at Flint River
Demolition, New Construction, Infrastructure
Design
$16,000,000 CJ est. value
Albany, GA 31705

SR 91 From SR 234 to Lee County Line
Infrastructure
Design
$5,000,000 CJ est. value
Albany, GA 31701

Home - New Residential Construction
New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Albany, GA 31701

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Widening on SR 133
Infrastructure
Post-Bid
$43,353,383 CJ est. value
Albany, GA 31705

401 Pine Parking Improvements
Infrastructure
Results
$374,859 CJ est. value
Albany, GA 31701

Albany State University Nursing and Health Science Simulation Lab Facility
New Construction, Infrastructure - 20,000 SF
Construction
$8,000,000 CJ est. value
Albany, GA 31705

Jefferson Street Living and Learning Center
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Albany, GA 31701

Chehaw Improvements - City of Albany
Renovation, Infrastructure
Conception
$330,930 CJ est. value
Albany, GA 31701

SR 520 From E of CR 473 / Pine Bluff Road to Piney Woods Creek
Infrastructure
Design
$2,000,000 CJ est. value
Albany, GA 31705

Diesel Equipment & Auto Collision Repair Center
New Construction, Infrastructure - 21,026 SF
Post-Bid
$7,000,000 CJ est. value
Albany, GA 31701

O'Reilly Auto Parts (AL3) / Albany
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Albany, GA 31701

SR 234 From CR 1645 / Byron Ridge Drive to SR 520bu
Infrastructure
Design
$7,000,000 CJ est. value
Albany, GA 31721

Last Updated 06/06/2023 05:12 AM
Project Title

Albany Pipe Rehabilitation

Physical Address View project details and contacts
City, State (County) Albany, GA 31701   (Dougherty County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

https://wfxl.com/news/local/city-of-albany-discuss-pipe-rehabilitation-project-estimating-almost-7-million - A $6,940,470 Albany pipe rehabilitation project was presented to the city commissioners on January 17th. The project will consist of cleaning, inspection and rehabilitation of existing sanitary manholes and large diameter sanitary sewer mains. All of this will be done for three miles on the north side of the city. Public Works Sewer Division Jeff Hughes explained the process that will be used to extend the life of the pipelines in this project. "The contractor inserts a liner into the concrete pipe, uh it's pyroglass and poxy res impregnated in it, uh it basically restores the structure integrity and helps with the corrosion resistance," said Hughes. The mayor expressed the need to be cognizant of the costs of future pipe projects. A decision on the project will be made at the next city commission meeting on January 24th. _________________________________________________________________________________ The Albany Pipe Rehabilitation project consists of the pre-rehabilitation cleaning, and inspection, followed by the rehabilitation of existing sanitary manholes and large diameter sanitary sewer mains in Albany Georgia. The work is located on the north side of the city and broken into the following phases: Phase 3 - Approximately 3000 feet of sanitary sewer along Seaboard Drive and 16th Avenue to Pace St and 11 manholes, Phase 4 - Approximately 1700 feet of sanitary sewer from Pace St. and 16th Avenue to Lift Station #66 and 7 manholes, Phase 5 - Approximately 4000 feet of sanitary sewer from Jefferson St along railroad right-of-way and across industrial area to Lift Station #88 and 11 manholes. Phase 2 - Approximately 4000 feet of sanitary sewer along Palmyra Road, Stuart and 18th Avenue to Seaboard Drive and 12 manholes, Phase 1 - Approximately 5000 feet of sanitary sewer along Schley Avenue between McLain Lane and Lift Station #67 and 16 manholes. Phase 3 is the base bid, the remaining phases are alternates to the base bid, refer to section 01 23 00 - Alternates for further details. The deadline for questions is October 19, 2022, at 2:30 p.m

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents