Similar Projects
T-396 over East Branch Chillisquaque Creek
Demolition, New Construction, Infrastructure
Conception
$1,345,000 CJ est. value
Mahoning Township, PA 17821

Fairville Avenue over I-81
Infrastructure, Renovation
Conception
$2,725,000 CJ est. value
Hummelstown, PA 17036

The Coronet At 21st
New Construction, Infrastructure - 2,587 SF
Design
$4,200,000 CJ est. value
Harrisburg, PA 17101

Home2Suites Hotel / Swatara Township
New Construction, Infrastructure - 64,878 SF
Design
$8,000,000 CJ est. value
Swatara, PA 17111

I-83 East Shore Section 3
Demolition, New Construction, Infrastructure
Bidding
$125,000,000 CJ est. value
Harrisburg, PA 17104

23WHM Training Wing Addition
Addition, Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Harrisburg, PA 17110

State Correctional Institute (SCI) Waymart - Exterior Building Envelop and Site Infrastructure Upgrades
Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Honesdale, PA 18431

Bethel Village
New Construction, Infrastructure - 46,784 SF
Post-Bid
$12,000,000 CJ est. value
Harrisburg, PA 17102

Wiconisco Water Storage Tank - Site Prep
Infrastructure
Results
$95,000 est. value
Lykens, PA

2022 Stormwater Improvement Project
Infrastructure
Results
$667,389 CJ est. value
Millersburg, PA 17061

Catherine Hershey Schools for Early Learning / Harrisburg
New Construction, Infrastructure - 46,963 SF
Construction
$5,000,000 CJ est. value
Harrisburg, PA 17102

The Hershey Company Manufacturing Facility -Derry Township / Project Milton
New Construction, Infrastructure - 250,000 SF
Construction
$75,000,000 CJ est. value
Hershey, PA 17033

Eisenhower Boulevard Flexible Space Building
New Construction, Infrastructure - 78,000 SF
Pending Verification
$8,000,000 CJ est. value
Middletown, PA 17057

Mister Car Wash
New Construction, Infrastructure
Pending Verification
$1,300,000 CJ est. value
Harrisburg, PA 17112

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Last Updated 07/07/2023 06:13 AM
Project Title

Hoffer Street Pump Station Improvements Project

Physical Address View project details and contacts
City, State (County) Steelton, PA 17113   (Dauphin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $865,973 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Cost Range: $750,000 - $1,100,000, The Project includes the following Work: Replacement of three (3) wastewater pumps and force main appurtenances; installation of an influent sewage grinder; installation of a submersible wet well mixing pump; exterior improvements; installation of an emergency generator; installation of new electrical equipment and controls; HVAC improvements and other miscellaneous work as required by the Contract Documents. Bid security in the form a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 10% The estimated cost of this Project is greater than Two Thousand Dollars ($2,000) and the federal Davis-Bacon Act shall apply. This project is being funded by PennVEST. The Borough of Steelton reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the Borough of Steelton, and to reject any or all proposals. Question Deadline: 06/21/2023 at 4:00 PM ET - Questions Submitted Through Electronically. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents