Similar Projects
Chester Creek Trail Phase 2
Design
$416,907 est. value
Media, PA 19063

Bituminous Seal Coat
Post-Bid
PA

Brandt School Road Betterment Marshall Township And Franklin Park Borough
Post-Bid
Harrisburg, PA

PA 104 to Market ST
Results
$500,000 to $999,999 est. value
PA

Mike Wood Boulevard - PA ST Keystone
Results
$1,000,000 to $5,000,000 est. value
PA

Scranton Ward, Scranton PA Stake Parking Lot Renovations
Renovation
Construction
$25,000 est. value
Clarks Summit, PA 18411

The Church Of Jesus Christ Of Latter-Day Saints, Parking Lot
Construction
$250,000 est. value
Berwick, PA 18603

Fall Brook Road T-612 Project
Post-Bid
Starlight, PA 18461

2019 Blairsville Highway Turn Back Project Old Main Street and South Liberty Street
Results
Blairsville, PA

Installation of the White Birch Road Extension at Humboldt Industrial Park
Construction
Hazleton, PA 18202

Bituminous Resurfacing Between Milepost 333.99 and Milepost 340.05 and Median Barrier Replacement Between Milepost 337.37 and Milepost 340.03
Post-Bid
PA

Horace Mann Street improvements
Results
Less than $775,000 est. value
PA

Whitebirch Road Extension
New Construction
Construction
Hazle Township, PA 18201

Yearly Contract for Flat Saw Cutting of Paved Surfaces
Term Contract
Post-Bid
New Stanton, PA 15672

Gettysburg Road Drainage and Widening Project Phase II
Results
Littlestown, PA

Reported 06/26/2020 12:00 AM
Project Title

Goodwin Hill Road Improvement Project

Physical Address View project details and contacts
City, State (County) Spraggs, PA 15362   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

1. The Contractor shall furnish all labor, materials, equipment, machinery, apparatus and tools, and perform all operations necessary to install, equip and put in to satisfactory operation, the work specified herein and shown on the Drawings. 2. All work shall be done in accordance with applicable portions of the Specifications. Any labor, materials, equipment, or apparatus not specifically mentioned herein or shown on the Drawings, which may be necessary for the proper completion of the entire work or of the individual items thereof, within the intent of these Specifications and Drawings, shall be furnished by the Contractor without additional compensation. 3. All work described in these Specifications and as shown on the Drawings shall be conducted in a manner to avoid any and all interruption of current operations at surrounding sites.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents