Similar Projects
Yorkfield Detention Basin Wall Detention Basin Wall Repairs - City of Elmhurst
Infrastructure
Conception
$250,000 est. value
Elmhurst, IL

Public Work Phase III and Other Improvements - City of Elmhurst
Renovation, Alteration
Conception
$2,475,000 est. value
Elmhurst, IL 60126

Blanchard Circle Mixed Use Buildings
New Construction, Infrastructure - 16,400 SF
Design
$4,000,000 CJ est. value
Wheaton, IL 60189

Poplar Creek Church Bartlett
New Construction, Infrastructure
Design
$1,800,000 CJ est. value
Bartlett, IL 60103

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Wheaton Pump Stations Variable Frequency Drive Additions
Renovation
Bidding
$200,000 CJ est. value
Wheaton, IL 60187

Water and Sewer Division Materials and Supplies
Infrastructure
Post-Bid
Aurora, IL

Water and Sewer Division Emergency Repair Program
Term Contract, Infrastructure
Post-Bid
Aurora, IL

Water Main Improvements
Alteration
Results
Naperville, IL

Centex Pumping Station Replacement
Renovation
Results
Downers Grove, IL 60516

Dash Downers Grove Apartments
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Downers Grove, IL 60515

Tri-State Tollway (I-294) Roadway and Bridge Reconstruction
Infrastructure
Construction
$205,907,075 CJ est. value
Hinsdale, IL 60521

Lexington Trace Parcel Unit 3 Townhomes
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Naperville, IL 60540

Lexington Trace Parcel Unit 3 Townhomes
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Naperville, IL 60540

Fire Station #13 - C012 - City of Aurora
New Construction, Infrastructure
Conception
$6,500,000 CJ est. value
Aurora, IL 60502

Last Updated 03/16/2023 06:06 AM
Project Title

Klefstad Lift Station and Force Main Improvements

Physical Address View project details and contacts
City, State (County) Wood Dale, IL 60191   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $590,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The rehabilitation work will consist of approximately 2, 785 LF of pre-construction cleaning and televising, 2,785 linear feet of 10" cured-in-place pipelining, removal, maintenance and reinstallation of two (2) submersible pumps, removal and replacement of valve vault plug valves and piping, removal and replacement of wet well piping, electrical equipment, and mechanical equipment, and polyurea lining of the wet well walls. All bids must be submitted in a sealed envelope marked in the lower left-hand corner "sealed bid, do not open; proposal of (name of bidder) for the city of wood dale klefstad lift station and force main improvements". Any proposals received after this time will not be considered. Any questions regarding this project can be directed to Patrick Hulsebosch, RJN Group, via email: patrick.hulsebosch@rjnmail.com, via phone: (224) 425-1014. questions will be accepted after 12:00 PM on Wednesday, March 8th , 2023, and no addenda will be issued after 4:00 PM on Friday, March 10th , 2023. Please contact QuestCDN.com at (952) 233- 1632 orinfo@questcdn.com for assistance with free membership registration, downloading, and working with this digital project information. Any questions regarding this project can be directed to Patrick Hulsebosch, RJN Group, via email: patrick.hulsebosch@rjnmail.com, via phone: (224) 425-1014.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents