Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Filters, Installation and Coil Cleaning Services
Alteration
Results
$245,000 est. value
Hillsboro, OR

Senior Center Solar Panel Project
Alteration
Results
$132,800 est. value
Redmond, OR 97756

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

Residential HVAC Contractors
Term Contract
Post-Bid
OR

Linn-Benton Community College Main Campus Takena Remodel Project
Alteration
Results
Albany, OR 97321

Medford School District MSDEC Annex HVAC Upgrades
Renovation
Post-Bid
Medford, OR 97501

Day Care Building - ADA Improvements
Renovation, Alteration
Results
$150,000 est. value
Lakeview, OR 97630

Lake Oswego Library HVAC and Controls Upgrade
Alteration
Post-Bid
$140,000 to $180,000 est. value
Lake Oswego, OR 97034

Gateway and Franklin Emx LED Lighting Upgrade
Alteration
Results
Eugene, OR

Industrial Chiller Maintenance
Alteration
Post-Bid
Eugene, OR

Last Updated 03/06/2022 10:51 PM
Project Title

South Umpqua School District - High School Covered Walkway Enclosure Rebid

Physical Address View project details and contacts
City, State (County) Myrtle Creek, OR   (Douglas County)
Category(s) Single Trades
Sub-Category(s) Concrete, Electric, HVAC, Painting, Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Work on this project consists of the remodel and enclosure of an existing covered walkway on the southwest side of South Umpqua High School. The area of the project is approximately 1950 sq.ft. Work will include demo of the existing concrete sidewalk and metal soffit. Construction will include reinforced and insulated CMU (concrete block), concrete slab, sidewalks, hollow metal windows, hollow metal exterior doors, gypsum board, painting, electrical and HVAC.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents