Similar Projects
Springfield Twp Multimodal Trail Ph 2
Infrastructure
Conception
$574,920 CJ est. value
Mercer, PA 16137

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

State Street Pedestrian Improvements
Infrastructure
Design
$769,960 CJ est. value
Hermitage, PA 16148

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

Digester Rehabilitation Project - Contract HMA 2022 - 01, Contract HMA 2022 - 02 and Contract HMA 2022 - 03
Renovation, Infrastructure
Bidding
$2,262,000 CJ est. value
Hermitage, PA 16148

Digester Rehabilitation Project - Contract HMA 2022 - 01, Contract HMA 2022 - 02 and Contract HMA 2022 - 03
Renovation, Infrastructure
Bidding
$2,262,000 CJ est. value
Hermitage, PA 16148

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Waterline Replacement Projects - Group 1
Infrastructure
Results
$2,123,000 est. value
Greenville, PA 16125

Lead Service Replacement Project
Infrastructure
Results
$264,000 est. value
Greenville, PA

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

SR 19 Br/Otter Ck Trib 3
Infrastructure
Conception
$675,000 CJ est. value
Mercer, PA 16137

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Parking Lot Resurfacing at Primary Health Sites
Infrastructure
Bidding
$2,000,000 CJ est. value
Greenville, PA 16125

Rehabilitation of Certain County-Owned Bridges With Steel Open Grid Decks in Mercer County
Infrastructure
Results
$637,900 CJ est. value
Mercer, PA 16137

Last Updated 09/29/2022 10:13 AM
Project Title

Hadley Road Booster Pump Station Relocation

Physical Address View project details and contacts
City, State (County) Sugar Grove Township, PA 16125   (Mercer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $749,500 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For all further requirements regarding bid submittal, bid security, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Attention is called to the fact that prevailing minimum wage rates as determined by the Secretary of the Department of Labor and Industry must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012. Any and all steel products used or supplied in the performance of the contract or any subcontracts shall be from steel made in the United States. The Owner hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received. Except as otherwise provided by law, no bidder may withdraw its bid for sixty (60) days after the Bid Due Date, unless the contract award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case the Bids shall remain open to acceptance and shall be irrevocable for a period of one hundred twenty (120) days after the Bid Due Date. The Project consists of the construction of a packaged potable water booster pump station, including, but not limited to site work, yard piping, instrumentation, utilities, and restoration. Clarification Deadline: 7/26/2022 4:00 PM The Work will be substantially complete within 560 days after the date when the Contract Times commence to run

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents