Similar Projects
Reconstruction of College Avenue - City of Carmel
Alteration
Conception
$250,000 est. value
Carmel, IN

Midtown At Westfield
New Construction, Infrastructure
Conception
$600,000,000 CJ est. value
Westfield, IN 46074

AutoZone #5765 / Indianapolis
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Indianapolis, IN 46217

Towns at Union PUD
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Westfield, IN 46074

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

City of Carmel - Clay Township Center - Addition - Bid-1 (Demolition, Civil Site Work and Building Shell)
Addition, Demolition, Infrastructure
Bidding
$300,000 CJ est. value
Carmel, IN 46032

Noblesville High School (H.S.) Athletics Addition - BP 2
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$3,200,000 CJ est. value
Noblesville, IN 46060

Expansion Connection Unit Related to the Water Meter Replacement
Infrastructure
Post-Bid
Carmel, IN

146th Street Water Main Extension
Infrastructure
Post-Bid
Carmel, IN

Abandoned Coal Mine Restoration
Results
$150,000 est. value

106th Street Water Main Replacement
Infrastructure
Results
Carmel, IN

Gorman & Bunch Orthodontics
New Construction, Infrastructure - 9,000 SF
Construction
$2,000,000 CJ est. value
Fishers, IN 46037

Legacy Townhomes /Carmel
New Construction, Infrastructure
Construction
$55,000,000 CJ est. value
Noblesville, IN 46062

Woods Robinson Briggs
New Construction, Infrastructure - 318,000 SF
Pending Verification
$100,000,000 CJ est. value
Westfield, IN 46074

Containers on College
New Construction, Infrastructure - 15,800 SF
Pending Verification
$5,000,000 CJ est. value
Indianapolis, IN 46202

Last Updated 12/05/2022 02:49 AM
Project Title

2022 Sewer Lining

Physical Address View project details and contacts
City, State (County) Carmel, IN 46032   (Hamilton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $181,508 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of cured-in-place lining of approximately 14,900-feet of sewers ranging from 6-inch to 12-inch, lining the interior of 19 manholes, and flow channel reconstruction of 40 manholes. Any questions prior to the bid should be directed to the Engineer: Philip Teague, PE pteague@jheng.com (preferred) 419-277-6039. Bid Bond in the amount of ten percent (10%) of the total Bid amount, including alternates with a satisfactory corporate surety or by a certified check on a solvent bank in the amount of ten percent (10%) of the amount of the Bid. The Bid Bond or certified check shall be evidence of good faith that the successful Bidder will execute within fifteen (15) calendar days from the acceptance of the Bid, the Agreement as included in the Bidding Documents. The Bid Bond or certified check shall be made payable to the Owner. Any Bid may be withdrawn prior to the scheduled deadline for receipt of Bids, but no bidder shall withdraw his Bid within sixty (60) days after the actual opening of the Bids. All Bid Bonds and certified checks of unsuccessful bidders will be returned by the Owner upon selection of the successful Bidder and execution of the Agreement, and provision of the required Performance Bond and Payment Bond. Award will be made to the low, responsive, responsible bidder. The low, responsive, responsible bidder must not be debarred, suspended, or otherwise be excluded from or ineligible for participation in federally assisted programs under Executive Order 12549. The Contractor must conform to the antidiscrimination provisions of Ind. Code 5- 16-6 et seq. A Performance Bond with good and sufficient surety, acceptable to the Owner and Engineer, shall be required of the successful Bidder in an amount equal to at least one hundred percent (100%) of the Contract Price, conditioned upon the faithful performance of the Agreement. The Contractor shall execute a Payment Bond to the Owner, approved by Owner and Engineer and for the benefit of the Owner, in an amount equal to one hundred percent (100%) of the Contract Price. The Payment Bond is binding on the Contractor, their subcontractor, and their successors and assigns for the payment of all indebtedness to a person for labor and services performed, material furnished, or services rendered. The Payment Bond must state that it is for the benefit of the subcontractors, laborers, material suppliers, and those performing services. The surety of the Payment Bond may not be released until one (1) year after the Owner's final settlement with the Contractor. The successful Contractor will be required to enroll in and verify the work eligibility status of all employees hired after the date of this Contract through the E-Verify program. The Contractor will also be required to sign an affidavit concerning employment of unauthorized aliens. A copy of the affidavit is included in the Bid Documents. The Contractor must comply with SRF requirements pertaining to Disadvantaged Business Enterprises (DBE). Bidders on this work shall be required to comply with the provisions of the President's Executive Order No. 11246, as amended. The Bidders shall also comply with the requirements of 41 CFR Part 60 - 4 entitled Construction Contractors - Affirmative Action Requirements. The Owner reserves the right to reject and/or cancel any and all Bids, solicitations and/or offers in whole or in part as specified in the solicitation when it is not in the best interests of the governmental body as determined by the purchasing agency in accordance with IC 5-22-18-2. The Owner also reserves the right to waive irregularities in any Bid, and to accept any Bid which is deemed most favorable to the Owner.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents