Similar Projects
Fairview Park - Pump Station and Wetlands Recirculation System - City of Costa Mesa
Infrastructure
Conception
$550,000 est. value
Costa Mesa, CA 92628

Adams Avenue Active Transportation Project - City Of Costa Mesa
Alteration
Conception
$3,750,000 est. value
Costa Mesa, CA 92626

Washington Well Improvements: Well Drilling (Phase I)
Infrastructure
Bidding
$3,340,000 est. value
Santa Ana, CA 92701

Frank R. Bowerman Phase VIII - A1 Groundwater Protection
Infrastructure
Bidding
$60,000,000 est. value
Irvine, CA 92602

Maintenance, Repair, and Replacement of Irrigation Booster Pumps and Related Component
Alteration
Post-Bid
CA

Skate Park Upgrades
Alteration
Post-Bid
$960,000 est. value
Brea, CA

Beneta Well No. 2 - Phase 1 Drilling
Infrastructure
Results
$1,400,000 to $1,500,000 est. value
Tustin, CA 92780

Citywide Sanitary Sewer Improvement Program
Infrastructure
Results
Anaheim, CA 92805

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Construction
Anaheim, CA

City Hall - Cast Iron Drainage Repipe - City of Costa Mesa
Infrastructure
Conception
$300,000 est. value
Costa Mesa, CA 92626

Beneta Well No. 2 - Phase II Equipping Project
Infrastructure
Bidding
$3,430,850 est. value
Tustin, CA 92780

Primary Sedimentation Basins No. 3-5 Replacement at Plant No. 1
Alteration
Post-Bid
CA

CALLE REAL Waterline Improvements
Infrastructure
Results
$880,000 est. value
San Clemente, CA 92673

Tewinkle Park Lakes Upgrades - 700137 - City of Costa Mesa
Infrastructure
Conception
Less than $1,000,000 est. value
Costa Mesa, CA 92626

Country Hills Subdivision Pavement and Water Improvements - Phase 2
Infrastructure
Bidding
$1,900,000 est. value
Brea, CA

Reported 06/27/2022 02:11 PM
Project Title

Well Site No. 9 - City of Fountain Valley

Physical Address View project details and contacts
City, State (County) Fountain Valley, CA   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value Less than $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. As of June 23, 2022, this project is currently in the FY 2022-2032 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents